A United Kingdom buyer, with 53 published contracts, worth £36.8m, most recently yesterday.
Top 5 suppliers won 73% of awarded value — £21m of £28.9m across 30 awards.
UKAEA requires a complete ultra-high temperature materials testing system with integrated load frame, heating, environmental control, and comprehensive supplier support including installation, training, and maintenance.
Complete design, manufacture, and installation of the Integrated Control and Safety System for the H3AT Tritium Facility at Culham.
UKAEA Culham Campus seeks a provider of specialist scaffolding, rigging, and environmental waste management services to support ongoing industrial operations and maintenance.
UKAEA seeks Safety Case Engineering support services on a call-off basis for fusion research facilities over a 3-year period with optional extension, covering hazard identification, risk assessment, and regulatory compliance across radiological and conventional process hazards.
Design and deploy Microsoft Teams Direct Routing with SBC integration, SIP provisioning, emergency calling, security compliance, and full managed services including monitoring and user enablement.
Develop and test a commercially-driven asset recovery strategy for JET facility decommissioning to quantify cost offsets and inform future procurement approaches.
Enhance existing software through modification and validate performance to support project progression.
Managed support and consulting services for Unit4 ERP Vision systems including payroll extraction and continuous system improvements.
UK Atomic Energy Authority requires supply and installation of compatible water cooling system components for a relocated vacuum furnace at Culham Campus.
Continuation of electrical installation, commissioning and remedial works at the ESS Active Cells Facility in Sweden with the incumbent contractor Optimum Electrical Engineering Ltd.