This contract involves the supply and installation of a specialized dynamic hydraulic actuator along with necessary equipment for conducting mechanical shock tests. The actuator must meet specific requirements to perform tests according to UN Regulation No. 100 and ISO 6469-1:2019 for objects weighi
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In research innovation, BOSMAL AUTOMOTIVE RESEARCH AND DEVELOPMENT INSTITUTE LTD has awarded 4 contracts to 4 suppliers.
Across research innovation, the most active winners are WOLF LABORATORIES LIMITED, MV CORPORATION EOOD, ALTIUM INTERNATIONAL SRO — the field to beat, or your route in as a partner.
This contract involves the procurement of a fully mobile system for measuring emissions under real driving conditions, known as the Portable Emission Measurement System (PEMS). This system is intended for research, development, and homologation (Euro 7) of road vehicles, including both light and hea
The contract involves the delivery of an RF system suitable for conducting tests according to international standards and documents: ISO 11452-2, ISO 11452-4, UN Reg.10 Rev.06 20MHz-2GHz (draft rev.7 - 6GHz) and vehicle manufacturer standards: PSA Group B21 7110D, VW TL81000, BMW GS 95002-2, FCA CS-
This contract involves the delivery of a Radio Frequency (RF) system suitable for conducting tests according to international standards and documents: ISO 11452-2, ISO 11452-4, UN Reg.10 Rev.06 20MHz-2GHz (draft rev.7 - 6GHz) and vehicle manufacturer standards: PSA Group B21 7110D, VW TL81000, BMW G
The contract involves the supply of a fuel measurement device for laboratory testing of fuel consumption in internal combustion engines on an engine test bench. Key details include: 1. Measurement capacity for fuel consumption exceeding 450 kg/h. 2. Fuel circulation flow rate in the measurement d
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.