This contract involves the design, construction, delivery, and commissioning of a series of shielding chambers intended for the METALIC Laboratory. The METALIC Laboratory is focused on the separation of radionuclides such as 89Zr and 64Cu, which are produced by irradiating metallic targets in a cycl
Tender closed on 15 Jul 2025. Awaiting award.
This contract involves the delivery, installation, and training of staff for information technology equipment at the National Centre for Nuclear Research (NCBJ) POLATOM Radioisotope Centre. The procurement is divided into two parts: Part 1 includes server devices, and Part 2 includes accessories for
The contract involves the delivery, installation, and training of staff at the National Centre for Nuclear Research (NCBJ) POLATOM Radioisotope Centre. Suppliers are required to provide IT equipment, including accessories and licenses, to ensure proper use of the equipment. The contract is divided i
This contract involves the design, construction, delivery, and commissioning of a series of shielding chambers intended for the METALIC Laboratory. The METALIC Laboratory is focused on the separation of radionuclides such as 89Zr and 64Cu, which are produced by irradiating metallic targets in a cycl
This contract involves the delivery, installation, and training of staff at the National Centre for Nuclear Research (NCBJ) POLATOM Radioisotope Centre. The procurement includes information technology equipment and accessories, along with licenses for proper usage. The contract is divided into three
Calderdale Borough Council seeks quotations for designing and installing an air source heat pump system at Brighouse Swimming Pool to replace gas heating as part of the Public Sector Decarbonisation Scheme.
Green hydrogen supply meeting ISO 14687:25 standards with equipment and services for multiple applications across Highland Council.
Access up to £5.8 million in UKRI funding to scale-up new automotive and aerospace manufacturing technologies over 2-4 years, with support covering 80% of full economic costs.
Access up to £4.5 million in UK funding over 60 months to build a network accelerating manufacturing innovation scale-up in aerospace, automotive, and advanced manufacturing sectors.