A United Kingdom buyer, with 5 published contracts, worth £1.3m, most recently 3 months ago.
Top 5 suppliers won 100% of awarded value — £2.6m of £2.6m across 10 awards.
Iarnród Éireann (Irish Rail) is seeking suppliers for the provision and delivery of plastic cable route troughing. This initiative is part of our ongoing efforts to upgrade and renew our cable infrastructure across the network. We are moving away from traditional concrete troughing to plastic altern
This project seeks a contractor to install rock fall netting on the rock cutting assets located at 13 miles and 1320 yards along the Dublin to Wexford Railway Line. Additionally, the contractor will need to clear vegetation, soil, and loose rock from another rock cutting asset in the same area. The
This contract opportunity involves the complete or partial construction and civil engineering work for the UBS536A Culvert and BL386 Preparation Works. The project is valued at approximately €125,145.83 and is being offered by Iarnród Eireann-Irish Rail. Suppliers are invited to provide their servic
Iarnród Éireann, the Irish Rail service, is seeking a qualified contractor to provide maintenance and servicing for fire safety equipment across more than 600 locations throughout Ireland. The equipment includes portable fire extinguishers, fire blankets, hose reels, hydrants, fire extinguisher bomb
This project involves the construction of an extension to the Solid State Interlocking (SSI) room at Limerick Junction. The extension is needed to accommodate additional equipment for the new Foynes Line, ensuring there is adequate space for advanced signaling and control systems. The goal is to enh