Iarnród Éireann (Irish Rail) is seeking suppliers for the provision and delivery of plastic cable route troughing. This initiative is part of our ongoing efforts to upgrade and renew our cable infrastructure across the network. We are moving away from traditional concrete troughing to plastic altern
Contract awarded. Originally published 5 months ago.
Only 1 prior award here — too little to read.
In construction, IARNRD EIREANNIRISH RAIL has awarded 1 contract to 1 supplier.
Across construction, the most active winners are PORTAKABIN LIMITED, SPECIALIST COMPUTER CENTRES PLC, VONROLL HYDRO GERMANY GMBH CO KG — the field to beat, or your route in as a partner.
This project seeks a contractor to install rock fall netting on the rock cutting assets located at 13 miles and 1320 yards along the Dublin to Wexford Railway Line. Additionally, the contractor will need to clear vegetation, soil, and loose rock from another rock cutting asset in the same area. The
This contract opportunity involves the complete or partial construction and civil engineering work for the UBS536A Culvert and BL386 Preparation Works. The project is valued at approximately €125,145.83 and is being offered by Iarnród Eireann-Irish Rail. Suppliers are invited to provide their servic
Iarnród Éireann, the Irish Rail service, is seeking a qualified contractor to provide maintenance and servicing for fire safety equipment across more than 600 locations throughout Ireland. The equipment includes portable fire extinguishers, fire blankets, hose reels, hydrants, fire extinguisher bomb
This project involves the construction of an extension to the Solid State Interlocking (SSI) room at Limerick Junction. The extension is needed to accommodate additional equipment for the new Foynes Line, ensuring there is adequate space for advanced signaling and control systems. The goal is to enh
IÉ seeks a single travel management service provider to deliver a comprehensive, cost-effective solution for all domestic and international business travel needs.
Tender for 24/7 toll collection and facility cleaning services at Tamar Bridge, with a three-year initial term and optional extensions up to eight years maximum, budgeted at £944,671 annually.
Seek a delivery partner to provide heavy maintenance overhaul services for Class 397 rolling stock from 2028 to mid-2030, including scheduled maintenance at multiple mileage intervals.
FBRS JV is seeking a road-rail trailer solution capable of safely transporting long welded rail sections (216m) across diverse terrain while meeting strict operational and sustainability standards.