Construction Project for Gas and Steam Blocks
This contract involves the design and construction of a building project necessary to obtain a construction permit for the construction of two gas-steam blocks. Each block will operate in a combined cycle (CCGT) with a gross electrical power output of 650-750 MWe. The project will be delivered in a
AwardedConstructionPolandPublished 27 Apr 2025