BIURO STUDI W PROJEKT W I REALIZACJI ENERGOPROJEKT KATOWICE S A
A United Kingdom supplier, with 1 awarded contract, totalling £3.9m, most recently 13 months ago.
This contract involves the design and construction of a building project necessary to obtain a construction permit for the construction of two gas-steam blocks. Each block will operate in a combined cycle (CCGT) with a gross electrical power output of 650-750 MWe. The project will be delivered in a