COSTAIN LIMITED H7HEATHROW
This contract opportunity involves conducting intrusive surveys to assess and identify the necessary replacement of faulty and outdated water treatment and pre-treatment equipment used in the condenser water circuits for cooling towers. Additionally, the project includes the survey and design of dig
ClosedEnergy & Utilities🇬🇧United KingdomPublished 16 Oct 2025
est.£1,000,000Deadline 22 Oct 2025
COSTAIN LIMITED H7HEATHROW
Heathrow Airport is seeking suppliers to conduct a safety survey and design enhancements for height barriers at specific locations. This initiative is in response to public health concerns regarding breaches of atrium barriers, which have led to serious incidents. The project aims to implement anti-
ClosedConstruction🇬🇧United KingdomPublished 16 Oct 2025
est.£250,000Deadline 22 Oct 2025
COSTAIN LIMITED H7HEATHROW
This contract involves conducting intrusive surveys to assess the condition of assets within the Secondary Chilled Water (CHW) and Low Temperature Hot Water (LTHW) systems at Terminal 2. The focus will be on evaluating the Pressurisation Units (PUs) and Automatic Air Vents (AAVs). Additionally, supp
ClosedFacilities Management🇬🇧United KingdomPublished 16 Oct 2025
est.£250,000Deadline 22 Oct 2025
COSTAIN LIMITED H7HEATHROW
This contract opportunity involves conducting intrusive surveys to assess and identify the necessary replacement of faulty and outdated water treatment and pre-treatment systems for the condenser water circuits that support the cooling towers. Additionally, the project includes the survey and design
ClosedEnergy & Utilities🇬🇧United KingdomPublished 16 Oct 2025
est.£1,000,000Deadline 22 Oct 2025
COSTAIN LIMITED H7HEATHROW
This contract opportunity involves the demolition, design, and installation of various architectural elements for the T2 Space Optimization project at Heathrow Airport. Suppliers are invited to provide services for the following key areas:
1. **Demolition**: The subcontractor will be responsible fo
ClosedConstruction🇬🇧United KingdomPublished 15 Oct 2025
est.£500,000Deadline 21 Oct 2025
COSTAIN LIMITED H7HEATHROW
This contract opportunity involves the design and installation of Mechanical, Electrical, and Plumbing (MEP) systems for space optimization at the Landside area. Key components of the project include:
1. **MEP Design**: Develop comprehensive designs for the MEP systems.
2. **Installation**: Execute
ClosedConstruction🇬🇧United KingdomPublished 15 Oct 2025
est.£500,000Deadline 21 Oct 2025