A United Kingdom buyer, with 1 published contract, worth £1.0m, most recently 5 months ago.
Top 2 suppliers won 100% of awarded value — £2.0m of £2.0m across 2 awards.
The Winznau Weir, built between 1914 and 1917, is part of the Gösgen run-of-river hydroelectric power plant operated by Alpiq Hydro Aare AG. It directs the Aare River into a 4.8 km long upper water channel leading to the newly constructed power house in Niedergösgen (1996-2000). The weir is over 110