The Winznau Weir, built between 1914 and 1917, is part of the Gösgen run-of-river hydroelectric power plant operated by Alpiq Hydro Aare AG. It directs the Aare River into a 4.8 km long upper water channel leading to the newly constructed power house in Niedergösgen (1996-2000). The weir is over 110
Contract awarded. Originally published 9 months ago.
Only 2 prior awards here — too little to read.
In engineering, ALPIQ HYDRO AARE AG has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are VYSIION LIMITED, Raise Telecoms Ltd, Fieldway Compliance Limited — the field to beat, or your route in as a partner.
Ireland's Department of Agriculture seeks an accredited laboratory to analyze approximately 1,500 nematode samples annually from soil, peat, and plant materials to support national plant health controls and protect the agricultural industry.
Architectural services required for a new 3G sports dome and community facility refurbishment project in Ireland, supported by the PEACEPLUS programme, with tender submissions closing 20th November 2026.
Ireland seeks a health and safety consultancy services framework with an electronic management system for temporary traffic management, work plans, and asset documentation.
AFC Harrogate requires a professional asset condition survey to evaluate current facility and asset conditions for planning and investment purposes.