Skip to content
BidSonarBidSonar

Closed contract

Environmental Monitoring for Construction Project D11 1108 Jaroměř – Trutnov

This project involves environmental monitoring, particularly the selection of measurement and sampling locations, which may not be final for some parameters. The construction has undergone an Environmental Impact Assessment (EIA), which recommended specific monitoring locations, especially for noise

Published 23 Dec 2025 · 11 months agoTED

Tender deadline passed on 20 Jan 2026.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

20 Jan 2026

10 months ago

Contract value

est.CZK 28,318,040

CZK

Sector

Construction

Browse related listings

Location

Czech Republic

Publisher
Publications Office of the European Union
Record ID
860281-2025

Lifecycle

Tender closed on 20 Jan 2026. Awaiting award.

Closed
  1. Published23 Dec 202511 months ago
  2. Tender deadline20 Jan 202644 weeks ago

Brief

This project involves environmental monitoring, particularly the selection of measurement and sampling locations, which may not be final for some parameters. The construction has undergone an Environmental Impact Assessment (EIA), which recommended specific monitoring locations, especially for noise measurement and air pollution monitoring. The selection of these locations is also dependent on the requirements of the relevant state authority overseeing the monitored areas. Additionally, the selection may be influenced by the property owner's consent for access to the monitored sites. The chosen locations may change between monitoring periods due to property owner refusals or conditions such as a dry watercourse at the time of sampling.

Track record

Open field. No single supplier dominates the field.

72 awards · 44 winners

In engineering, DIRECTORATE OF ROADS AND HIGHWAYS has awarded 72 contracts to 44 suppliers.

Who wins here

  1. PONTEX SPOL S RO7× · 10%
  2. VALBEK SPOL S RO3× · 4%

+38 more suppliers

Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from DIRECTORATE OF ROADS AND HIGHWAYS

4 listingsView all

Slope Mower Replacement and Accessories

DIRECTORATE OF ROADS AND HIGHWAYS

This contract involves the replacement of old and non-compliant slope mowers for the Road and Motorway Directorate. The project aims to procure new slope mowers and necessary accessories to ensure efficient and safe maintenance of road slopes. Suppliers are invited to provide proposals for the suppl

ClosedTransport & LogisticsCzech RepublicPublished 26 Feb 2026

est.CZK 19,915,000Deadline 13 Mar 2026

Architectural and Technical Services for Main Inspections

DIRECTORATE OF ROADS AND HIGHWAYS

This contract involves the provision of architectural, construction, technical, and inspection services, specifically focusing on conducting main inspections in accordance with the Czech standard ČSN 73 6221. The total value of the contract is 985,500 CZK. Suppliers are invited to provide these esse

AwardedConstructionCzech RepublicPublished 26 Feb 2026

CZK 985,500

Tree Maintenance and Removal Services in the Czech Republic

DIRECTORATE OF ROADS AND HIGHWAYS

This contract opportunity involves the maintenance and removal of trees and shrubs along roadways, adhering to the standards set by the Road and Motorway Directorate of the Czech Republic. Suppliers are invited to provide services that ensure the health and safety of roadside vegetation, which may i

AwardedEnvironmental ServicesCzech RepublicPublished 25 Feb 2026

CZK 842,250

Construction of D6 Highway Section in Karlovy Vary

DIRECTORATE OF ROADS AND HIGHWAYS

This public procurement contract involves the construction of a section of the D6 highway from Karlovy Vary to Olšová Vrata. The total length of the project is 8,020 meters, with the first third designated as a highway allowing speeds of 130 km/h, while the remaining two-thirds will be a divided fir

ClosedConstructionCzech RepublicPublished 23 Feb 2026

est.CZK 4,303,000,000Deadline 12 Mar 2026

Open in Construction

4 open listingsView all