Skip to content
BidSonarBidSonar

Market engagement

Principal Contractor for Royal Observatory Edinburgh Historic Building Roof and Window Refurbishment

STFC seeks a principal contractor to manage roof, window, and enabling works on a historic listed building at Royal Observatory Edinburgh while achieving net zero refurbishment goals.

Published 24 Nov 2026 · TodayFind a Tender

View notice on sourceFind a Tender

How to respond is on the publisher's site

Engagement closes in

10 days

on 3 Dec 2026

Contract value

£1,000,000indicative

Pounds sterling

Sector

Construction

Browse related listings

Location

United Kingdom

South West

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-07c2e1

Lifecycle

10 days left to respond to this market engagement. No tender has been published yet.

Open
  1. Published24 Nov 2026today
  2. Today24 Nov 2026
  3. Engagement closes3 Dec 2026in 9 days

Brief

The Science and Technology Facilities Council (STFC), part of UK Research and Innovation, is seeking a principal contractor to lead the refurbishment of the 1894 Building at the Royal Observatory Edinburgh (ROE). This Category A listed building project aims to achieve net zero energy performance while preserving its historic character. The successful contractor will manage all construction activities on-site and deliver the following scope of work: Roof and Structural Works: • Replace lead roofs and lead-lined gutters on the South Range and entry roof • Repair structural timber and install new insulation • Install conservation rooflights and restore decorative leadwork to heritage standards • Install an insulated warm roof to the first floor with structural alterations and door opening modifications • Install new external cast iron rainwater goods and lightning protection system Window and Door Improvements: • Refurbish existing windows and replace glazing with slim-line double glazing • Replace select external doors Key Responsibilities: • Act as principal contractor under the Construction (Design and Management) Regulations 2015 (CDM 2015) • Plan, manage, monitor, and coordinate all contractors and subcontractors • Ensure the building becomes wind and watertight to prevent further historic fabric damage • Maintain safety and operational continuity on an occupied scientific and public site • Deliver works without disruption to observatory operations or visitor experience This enabling works phase is critical to the overall net zero retrofit strategy and must be executed to the highest standards of heritage conservation and construction management.

Track record

Open field. No single supplier dominates the field.

34 awards · 26 winners

In construction, UK Research & Innovation (UKRI) has awarded 34 contracts to 26 suppliers.

Who wins here

+20 more suppliers

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from UK Research & Innovation (UKRI)

4 listingsView all

Open in Construction

4 open listingsView all