Germany – Construction Works – OPZ - Partial Renovation: Network Technology Ground Floor
The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the power supply due to fire protection deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Prepar
The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the power supply due to fire protection deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Preparatory work, such as cutting a new door element, demolishing wall sections, and modifying raised floor constructions, is necessary. The 3rd basement is located approximately at -10m relative to the access areas, and there is no direct access. As part of the fire protection renovation of the Operational Center, the anesthesia and pain clinic will be completely restructured and freed from all electrical and fire protection deficiencies. The main distributors for power and IT infrastructure have already been renewed and are free of defects; however, there are still numerous deficiencies in the stations that will be addressed as part of this project. Since some rooms will serve different functions in the future, a comprehensive revision of the electrical installation is necessary. The anesthesia station is currently supplied by two sub-distributors - this change will also take place in the project. The main routes cross the fire section and will be sealed according to regulations upon completion. The window offices will remain connected via base channels, which will be newly installed. Interior spaces will be supplied through existing connections as well as additional lines in lightweight walls. The existing lighting will mostly be retained; only rooms with new ceilings will receive new lighting. The expected start of network technology on the ground floor is scheduled for February 2026. An open European tender will be issued for the network technology services.
Track record
Thin record. Only 1 prior award here — too little to read.
1 award · 1 winner
In construction, UNIVERSITY HOSPITAL BONN AR has awarded 1 contract to 1 supplier.
The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the electrical supply due to fire safety deficiencies. The first construction phase involves renewing the low-voltage main distribution in the 3rd basement level. Preparat
ClosedConstruction🇩🇪GermanyPublished 15 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 18 Dec 2025
The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the electrical supply due to fire safety deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Prepa
ClosedConstruction🇩🇪GermanyPublished 8 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 13 Jan 2026
The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This project involves renovating the electrical supply due to existing fire safety deficiencies. As part of the fire protection renovation of the entire Operational Center, the anesthesia departme
ClosedConstruction🇩🇪GermanyPublished 7 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 8 Jan 2026
The University Hospital Bonn AöR is planning to enter into a service contract for the inspection, maintenance, and safety checks of ECMO devices and accessories from the manufacturers Getinge/Maquet and Fresenius/Xenios. This includes compliance testing according to DGUV V3 standards and optional re
ClosedFacilities Management🇩🇪GermanyPublished 26 Nov 2025
Thanet District Council invites tenders from construction contractors to deliver a 7-month decarbonisation retrofit programme starting March 2027, including heat pump installation, electrical upgrades, insulation and roof works.
FXPlus is seeking market information on options to repair, resurface, or convert the MUGA facility at Penryn Campus to inform project planning and procurement decisions.
Lewisham Council is seeking contractors to deliver £83 million in housing repairs, maintenance and investment works across five separate contract lots, with restrictions limiting each contractor to winning one lot.
Construction🇬🇧United KingdomPublished 27 Nov 2026
£69,166,667indicativeEngagement closes 14 Dec 2026