Network Technology Renovation at Bonn University Hospital
The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the power supply due to fire safety deficiencies. The first construction phase involves renewing the low-voltage main distribution (NSHV) in the 3rd basement level. Prepar
The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the power supply due to fire safety deficiencies. The first construction phase involves renewing the low-voltage main distribution (NSHV) in the 3rd basement level. Preparatory work includes demolition tasks such as cutting a new door element, demolishing wall sections, and modifying raised floor structures. The 3rd basement is located approximately 10 meters below the access areas, and there is no direct access. As part of the electrical renovation in the operating room area, the ceiling supply units (DVE) in the operating rooms will also be replaced. The new DVE requires more network connections than the existing ones, necessitating the retrofitting of some network connections. The installation of cables will primarily take place through the suspended ceiling, which is partially developed as a separate floor (1st basement). The construction project will be executed in two phases, with strict adherence to the specified timelines. Connections will be made to existing or newly installed network cabinets. The anticipated start for the network technology work in the basement is scheduled for April 2026. The work will be carried out in two phases: the first phase from April 2026 to February 2027, and the second phase from March to December 2027. An open European tender will be issued for the network technology services.
Track record
Thin record. Only 1 prior award here — too little to read.
1 award · 1 winner
In construction, UNIVERSITY HOSPITAL BONN AR has awarded 1 contract to 1 supplier.
The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the electrical supply due to fire safety deficiencies. The first construction phase involves renewing the low-voltage main distribution in the 3rd basement level. Preparat
ClosedConstruction🇩🇪GermanyPublished 15 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 18 Dec 2025
The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the electrical supply due to fire safety deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Prepa
ClosedConstruction🇩🇪GermanyPublished 8 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 13 Jan 2026
The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This project involves renovating the electrical supply due to existing fire safety deficiencies. As part of the fire protection renovation of the entire Operational Center, the anesthesia departme
ClosedConstruction🇩🇪GermanyPublished 7 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 8 Jan 2026
The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the power supply due to fire protection deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Prepar
ClosedConstruction🇩🇪GermanyPublished 3 Dec 2025
Nominal value — the true amount was likely withheld by the publisher.Deadline 8 Jan 2026
Thanet District Council invites tenders from construction contractors to deliver a 7-month decarbonisation retrofit programme starting March 2027, including heat pump installation, electrical upgrades, insulation and roof works.
FXPlus is seeking market information on options to repair, resurface, or convert the MUGA facility at Penryn Campus to inform project planning and procurement decisions.
Lewisham Council is seeking contractors to deliver £83 million in housing repairs, maintenance and investment works across five separate contract lots, with restrictions limiting each contractor to winning one lot.
Construction🇬🇧United KingdomPublished 27 Nov 2026
£69,166,667indicativeEngagement closes 14 Dec 2026