This contract involves the design and construction work for the rehabilitation of 234 collective housing units located in the Briquette neighborhood of Marly. The project includes the renovation and residential transformation of two sites (R1 and R2) with a total of 234 housing units, while the area
Contract awarded. Originally published 1 years ago.
Only 2 prior awards here — too little to read.
In construction, PARTENORD HABITAT has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves architectural services for the rehabilitation of 11 collective housing units and 76 individual housing units located on the streets of Rue des Déportés, Rue des Bleuets, and Rue du 19 Mars 1962 in the Luyo neighborhood of Fenain. The selected contractor will be responsible for
This contract involves architectural, engineering, and planning services for the rehabilitation of 172 individual rental housing units located in Conde Sur L'Escaut, specifically at the Residence le Jard. The main task for the project manager includes essential rehabilitation operations for building
The initial consultation No. 25243 aimed to provide services related to real estate diagnostics in the properties of Partenord Habitat. These services were divided into 14 lots based on geographical sectors, except for lots No. 12, 13, and 14, which cover the entire portfolio of Partenord Habitat. T
This contract is for the supply, installation, operation, and maintenance of electric vehicle charging stations for Partenord Habitat. It is a single-award framework agreement with no minimum amount and a maximum annual value of €500,000 excluding tax, totaling €2,000,000 excluding tax over the cont
Construction of new pedestrian footpaths and ancillary infrastructure at the Irish National War Memorial Gardens in Dublin.
Ireland is seeking qualified suppliers to repair existing fire doors and perform annual inspection and maintenance services.
Construction of a new 120m cycle and pedestrian bridge and integrated community park facilities across the River Foyle in Lifford and Strabane, Ireland.
Construction of a new steel footbridge over the Owenriff River at N59 Oughterard with access ramps, boundary walls, utilities relocation, and landscaping.