Skip to content
BidSonarBidSonar

Awarded contract

Romania – Earthworks for Railway Line Restoration

C.N.C.F. "C.F.R." S.A. is seeking suppliers for the design and execution of works necessary to reopen the railway line CF 703 Galati-Barlad, which was affected by natural disasters on September 14-15, 2024. The project involves restoring the railway infrastructure that was severely damaged due to ex

Published 17 Aug 2025 · 1 year agoTED

View on sourceTED

Award notice and full record on the publisher's site

Closing date

Not published

No closing date published

Contract value

RON 47,050,000

RON

Sector

Construction

Browse related listings

Location

Romania

Publisher
Publications Office of the European Union
Record ID
535424-2025

Suppliers

3 suppliers

Lifecycle

Contract awarded. Originally published 1 year ago.

Awarded

17 August 2025

Awarded — no open tender advertised

Brief

C.N.C.F. "C.F.R." S.A. is seeking suppliers for the design and execution of works necessary to reopen the railway line CF 703 Galati-Barlad, which was affected by natural disasters on September 14-15, 2024. The project involves restoring the railway infrastructure that was severely damaged due to exceptional rainfall and subsequent flooding. The work will cover a total length of 13,200 meters and includes tasks such as constructing access roads, dismantling existing structures, preparing the foundation for the embankment, and reinstating the railway superstructure. The contract duration is 67 months, with 7 months allocated for the actual work (1 month for design, 3 months for technical documentation approval, and 3 months for execution) and a 60-month warranty period. Interested suppliers can request clarifications regarding the documentation up to 10 days before the submission deadline.

Track record

Open field. No single supplier dominates the field.

3 awards · 3 winners

In construction, CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT has awarded 3 contracts to 3 suppliers.

Who wins here

  1. CITADINA 981× · 33%
  2. EUROPAN PROD S.A.1× · 33%
  3. EUROPAN PROD SA1× · 33%

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT

3 listingsView all

Romania – Railway Bridge Construction and Rehabilitation Works – Stage II SRCF Galați – 2 Lots (Design and Execution)

CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT

This procurement aims to design and execute works related to the investment objective "Rehabilitation Works for Railway Bridges, Viaducts, and Tunnels Stage II within the SRCF Galați area" – 2 lots (design and execution), according to the specifications document no. 724/MP/32 dated April 10, 2025, S

ClosedConstructionRomaniaPublished 4 Aug 2025

est.RON 80,710,712Deadline 11 Aug 2025

Romania – Railway Bridge Construction and Rehabilitation Works – Stage II SRCF Galați – 2 Lots (Design and Execution)

CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT

This procurement aims to design and execute works related to the investment objective "Rehabilitation Works for Railway Bridges, Viaducts, and Tunnels Stage II within the SRCF Galați area" – 2 lots (design and execution), according to the specifications document no. 724/MP/32 dated April 10, 2025, S

ClosedConstructionRomaniaPublished 3 Aug 2025

est.RON 80,710,712Deadline 11 Aug 2025

Romania – Railway Bridge Construction Works – Rehabilitation of Bridges, Viaducts, and Railway Tunnels Phase II in the Galați Region

CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT

This procurement aims to design and execute works related to the investment objective "Rehabilitation of Bridges, Viaducts, and Railway Tunnels" Phase II in the Galați Region. The project includes the preparation of technical designs and execution details, which will be verified by certified technic

AwardedConstructionRomaniaPublished 12 Jun 2025

RON 190,813,028

Open in Construction

4 open listingsView all