    ContractsRomania – Railway Bridge Construction and Rehabilitation Works – Stage II SRCF Galați – 2 Lots (Design and Execution)
    Closed contract

    Romania – Railway Bridge Construction and Rehabilitation Works – Stage II SRCF Galați – 2 Lots (Design and Execution)

    Contract value
    RON 80.7m
    Closed 11 Aug 2025

    This procurement aims to design and execute works related to the investment objective "Rehabilitation Works for Railway Bridges, Viaducts, and Tunnels Stage II within the SRCF Galați area" – 2 lots (design and execution), according to the specifications document no. 724/MP/32 dated April 10, 2025, S

    🇷🇴RomaniaPublished 3 Aug 2025· 1 years agoviaTED
    Contract value
    RON 80.7m
    Closed 11 Aug 2025
    Tender deadline passed on 11 Aug 2025.

    Decision brief

    4 fields
    • Contract value
      est.RON 80,710,712
      RON
    • Tender closed
      11 Aug 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇷🇴Romania

    Lifecycle

    Closed

    Tender closed on 11 Aug 2025. Awaiting award.

    3 Aug 2025Today11 Aug 2025

    Brief

    This procurement aims to design and execute works related to the investment objective "Rehabilitation Works for Railway Bridges, Viaducts, and Tunnels Stage II within the SRCF Galați area" – 2 lots (design and execution), according to the specifications document no. 724/MP/32 dated April 10, 2025, SRCF Galați. The project includes the development of technical designs and execution details, which will be verified by certified technical reviewers, and obtaining construction permits. The AFER approval for the specifications document developed within the technical project will also be obtained. The works will be executed following the approval of the railway and road traffic management plan. The general objectives of the project are as follows: improving railway traffic safety on the railway network; reducing adverse environmental effects; ensuring the safe movement of people and goods; eliminating and reducing costs generated by railway accidents and incidents; increasing the efficiency of railway network operation and maintenance in Romania; eliminating associated risks or restrictions, such as speed restrictions, tonnage limits, speed limitations, gauge limitations, and flood risks. The minimum investment indicators are: Lot 1: New single-track railway bridge with 4 spans of 34 m each; new structure with a lifespan of 100 years; rehabilitation of the railway embankment for a single track over approximately 20 m; complete restoration of 240 meters of railway line; maximum axle load for the rehabilitated structure and track: 22.5 t/axle; Lot 2: New single-track railway bridge with a span of 43.40 m; new structure with a lifespan of 100 years; rehabilitation of the railway embankment for a single track over approximately 400 m; complete restoration of 430 meters of railway line; maximum axle load for the rehabilitated structure and track: 22.5 t/axle. Economic operators are advised to visit and examine the work site, including the surroundings, and to obtain all necessary information for preparing their offers. The economic operator will take all necessary measures to avoid any accidents that could result in death or physical injury to a person and/or loss or damage to property, bearing full responsibility in the event of such occurrences. The economic operator will cover any potential costs, losses, or damages resulting from visiting the work site. It will be assumed that the bidder who is awarded and signs the contract has inspected and examined the work site, its surroundings, data, and other available information and is satisfied with all relevant aspects before submitting their offer. During the clarification request period, which is 22 days before the deadline for submitting offers, operators wishing to visit the site must announce their intention and send the organizer of the procedure a minimum of 48 hours in advance, the names of the delegated representatives. The organizer of the procurement procedure will confirm 24 hours in advance to all economic operators who have declared their intention to participate with offers any details related to this. Any interested economic operator has the right to request clarifications/additional information regarding the award documentation 22 days before the deadline for submitting offers. The contracting entity will respond clearly and completely to all requests for clarifications/additional information regarding the award documentation on the 12th day before the deadline for submitting offers. The contracting entity will not respond to clarification requests sent after the established deadline. Any request for clarifications must be submitted in SEAP, signed with an extended electronic signature.

    Track record

    3 awards · 3 winners
    Open field

    No single supplier dominates the field.

    In construction, CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT has awarded 3 contracts to 3 suppliers.

    Who wins here
    1. CITADINA 981× · 33%
    2. EUROPAN PROD S.A.1× · 33%
    3. EUROPAN PROD SA1× · 33%

    Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

    More from CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT

    3 listingsView all →
    AwardedConstruction🇷🇴Romania

    Romania – Earthworks for Railway Line Restoration

    C.N.C.F. "C.F.R." S.A. is seeking suppliers for the design and execution of works necessary to reopen the railway line CF 703 Galati-Barlad, which was affected by natural disasters on September 14-15, 2024. The project involves restoring the railway infrastructure that was severely damaged due to ex

    RON 47,050,000CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT
    Published 17 Aug 2025
    Construction🇷🇴Romania

    Romania – Railway Bridge Construction and Rehabilitation Works – Stage II SRCF Galați – 2 Lots (Design and Execution)

    This procurement aims to design and execute works related to the investment objective "Rehabilitation Works for Railway Bridges, Viaducts, and Tunnels Stage II within the SRCF Galați area" – 2 lots (design and execution), according to the specifications document no. 724/MP/32 dated April 10, 2025, S

    est.RON 80,710,712CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT
    Published 4 Aug 2025
    AwardedConstruction🇷🇴Romania

    Romania – Railway Bridge Construction Works – Rehabilitation of Bridges, Viaducts, and Railway Tunnels Phase II in the Galați Region

    This procurement aims to design and execute works related to the investment objective "Rehabilitation of Bridges, Viaducts, and Railway Tunnels" Phase II in the Galați Region. The project includes the preparation of technical designs and execution details, which will be verified by certified technic

    RON 190,813,028CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT
    Published 12 Jun 2025

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    First Floor Fit Out Work at Waterdale, Doncaster

    Doncaster NHS Foundation Trust invites tenders for the fit out of the first floor at Waterdale CYP Service on the High Street.

    est.£2,100,000ROTHERHAM DONCASTER AND SOUTH HUMBER NHS FOUNDATION TRUST
    Published 4 Sept 2026
    Construction🇬🇧United Kingdom

    Haybridge Avenue Public Open Space and Playground Development

    Telford & Wrekin Council seeks a contractor to design and deliver a new multi-age playground and public open space at Haybridge Avenue.

    est.£60,000Borough of Telford & Wrekin
    Published 4 Sept 2026
    Construction🇬🇧United Kingdom

    Fire-Damaged Council House Repair and Refurbishment - Kirkby in Ashfield

    Nottinghamshire County Council seeks a local contractor to fully repair and refurbish a fire-damaged 3-bedroom council house in Kirkby in Ashfield, including all building, mechanical and electrical works.

    est.£60,000Ashfield District Council
    Published 4 Sept 2026
    Construction🇬🇧United Kingdom

    Gutter Cleaning and Roof Anchor Testing Services

    Trafalgar Housing Association requires ongoing gutter cleaning, roof inspections, and roof anchor testing services for their residential properties.

    est.£60,000Trafalgar Housing Association
    Published 4 Sept 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    507080-2025
    CC
    Buyer
    CNCF CFR SA REGIONAL BRANCH CF GALAI OPERATIONAL UNIT
    Sector
    Construction