This framework agreement involves the supply of original manufacturer spare parts, excluding engines and engine parts, specifically for the brands Mercura and Bomag. The contract will be executed through the issuance of purchase orders, with defined minimum and maximum quantities. Suppliers are invi
Tender closed on 19 Sept 2025. Awaiting award.
This is a framework agreement for the preparation and analysis of core samples to test for asbestos and polycyclic aromatic hydrocarbons (PAHs) in road surfaces. The contract is for one year from the date of notification, with the possibility of two extensions. There is no minimum order requirement,
This contract involves the acquisition, delivery, and installation of school furniture and related services. The furniture will be used to equip existing colleges and the four new colleges that the department plans to build or renovate between 2026 and 2030. Additionally, furniture may be purchased
This contract involves framework agreements with minimum and maximum amounts in euros (excluding VAT). Lots 1 and 2 will be awarded to multiple economic operators as described in the regulations. However, Lot 3 will be awarded to a single economic operator. The services sought include the establishm
This framework agreement involves the maintenance and development of green spaces. Suppliers will be contracted through the issuance of purchase orders, with payments made based on unit prices and fixed rates. The minimum contract value is €35,000 (excluding VAT), and the maximum value is €150,000 (
South Wales Fire and Rescue Service requires a lift servicing and maintenance contractor for their estate-wide passenger lift equipment.
Solicitation for vendors to supply, install, and maintain vending machines stocked with beverages and snacks.
Opportunity to design, supply and install upgraded sports-themed play equipment and safety surfacing at Hopwas Playground and Playing Field in Tamworth, Staffordshire.
Ridgewood Village Hall car park upgrade including drainage installation, site grading, resurfacing, and parking bay line marking.