The contracting authority intends to establish a framework agreement for conducting hydrological studies, geotechnical studies, and field geophysical investigations at water crossings with pipelines, riverbank protections, and riverbed thresholds. Key details include: a) a maximum of 10 economic ope
Contract awarded. Originally published 11 months ago.
The contracting authority intends to establish a framework agreement for "Security, Monitoring, Intervention, and Supervision Services for the facilities belonging to SNTGN TRANZGAZ S.A." This contract is divided into 9 lots, with a maximum of one economic operator per lot. Key details include: a) N
The contracting authority intends to establish a sector contract for interior inspection services of gas pipelines. Suppliers have the right to request clarifications or additional information regarding the award documentation until the 18th day before the deadline for submitting offers, in accordan
The contracting authority intends to establish a framework agreement for "SCADA Data Acquisition Panels with RTU". The maximum number of economic operators that will be part of the framework agreement is 1. The frequency of awarding subsequent contracts is a maximum of 3 contracts per year. Estimate
The contracting authority, Societatea Nationala de Transport Gaze Naturale TRANSGAZ SA, is seeking to establish a sectoral contract for the supply of horizontal turbine meters. Suppliers interested in this opportunity can request clarifications or additional information regarding the procurement doc
Partner required to manage void housing properties, clear spaces, and update energy meters for new tenant occupancy from mid-July 2026 through 2029.
Provide eDNA metabarcoding analysis of 348 marine water samples to identify teleost fish and elasmobranch species from a Caribbean research expedition, delivering raw sequencing data by December 2026.
Main Contractor required to resurface an external multigame pitch at a London primary school, requiring experience in educational institution projects.
Engineering services provider needed to design water treatment upgrades and manage construction for Tory Group Water Scheme to achieve EU drinking water compliance standards.