A United Kingdom supplier, with 1 awarded contract, totalling £1.7m, most recently 10 months ago.
The contracting authority intends to establish a framework agreement for conducting hydrological studies, geotechnical studies, and field geophysical investigations at water crossings with pipelines, riverbank protections, and riverbed thresholds. Key details include: a) a maximum of 10 economic ope