Skip to content
BidSonarBidSonar

Awarded contract

Procurement of Aggregate Products for Asphalt Station

The National Company for Road Infrastructure Administration is seeking suppliers for the procurement of aggregate products, specifically sorted crushed stone in sizes 4-8 mm, 8-16 mm, 16-22.4 mm, and 16-31.5 mm, as well as crushed sand in the size of 0-4 mm for the Morlaca asphalt station in Cluj. T

Published 3 Jul 2025 · 1 year agoTED

View on sourceTED

Award notice and full record on the publisher's site

Closing date

Not published

No closing date published

Contract value

RON 1,276,200

RON

Sector

Construction

Browse related listings

Location

Romania

Publisher
Publications Office of the European Union
Record ID
436045-2025

Suppliers

3 suppliers

Lifecycle

Contract awarded. Originally published 1 year ago.

Awarded

3 July 2025

Awarded — no open tender advertised

Brief

The National Company for Road Infrastructure Administration is seeking suppliers for the procurement of aggregate products, specifically sorted crushed stone in sizes 4-8 mm, 8-16 mm, 16-22.4 mm, and 16-31.5 mm, as well as crushed sand in the size of 0-4 mm for the Morlaca asphalt station in Cluj. The estimated value of the framework agreement ranges from a minimum of 30,200 lei to a maximum of 1,852,750 lei, excluding VAT. The largest subsequent contract will be valued at 430,200 lei, excluding VAT. A minimum of two subsequent contracts will be awarded each year. This framework agreement does not constitute a legal basis for public fund commitment; however, it will facilitate the awarding of subsequent contracts that provide a legal basis for payment. The contracting authority reserves the right to modify the contract in accordance with Article 221 of Law 98/2016, provided that such modifications do not constitute substantial changes. Key clauses for potential modifications include: 1. Parties to the framework agreement; 2. Unit price adjustments; 3. Contract duration; 4. Subcontractors; 5. Payment methods and debt recovery; 6. Inspections and testing as per the agreement clauses. Interested suppliers may request clarifications or additional information regarding the procurement documentation up to 18 days before the deadline for submitting offers. The contracting authority will respond to all requests for clarification on the 11th day before the submission deadline. Any requests for clarification submitted after the specified date will be considered late.

Track record

Open field. No single supplier dominates the field.

3 awards · 3 winners

In manufacturing, NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA has awarded 3 contracts to 3 suppliers.

Who wins here

  1. SYLC CON TRANS1× · 33%
  2. GRANDEMAR SA1× · 33%
  3. GRANDEMAR S.A.1× · 33%

Across manufacturing, the most active winners are JIM DAVIES CIVIL ENGINEERING LIMITED, COMPASS MINERALS UK LTD, NAL PLANT LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA

4 listingsView all

Feasibility Study for Road Bridge Design Services in Suceava and Botosani

NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA

This contract involves the preparation of a feasibility study for the design of several road bridges in Romania. The project includes the following locations: Lot 1 - 1. Bridge on DN 2 at km 408+212 in Suceava; 2. Bridge on DN 2 at km 408+572 in Suceava; 3. Bridge on DN 2 at km 461+902 in Suceava; 4

ClosedConstructionRomaniaPublished 1 Mar 2026

est.RON 1,352,640Deadline 24 Mar 2026

Romania - National Road Maintenance Works - Framework Agreement for Summer Maintenance Works - Road Surface, Shoulders, Emergency Lanes, and Marking Lanes - D.R.D.P. TIMIȘOARA - S.D.N. TIMISOARA - YEAR I - II

NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA

This framework agreement is for ongoing summer maintenance works, including the road surface, shoulders, emergency lanes, and marking lanes, managed by D.R.D.P. TIMIȘOARA and S.D.N. TIMISOARA for the first two years. Suppliers interested in this opportunity can request clarifications or additional i

ClosedConstructionRomaniaPublished 11 Feb 2026

Deadline 27 Mar 2026

Open in Construction

4 open listingsView all