Skip to content
BidSonarBidSonar

Closed contract

LED Warning Signal Devices for Dangerous Curves

This contract involves the procurement and transportation of LED warning signal devices for marking dangerous curves and sectors on national roads and highways managed by the National Company for Road Infrastructure Administration (C.N.A.I.R. S.A.). The contract includes the supply, transport, and i

Published 2 Jul 2025 · 1 year agoTED

Tender deadline passed on 23 Jul 2025.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

23 Jul 2025

1 year ago

Contract value

Not disclosed

Source did not declare a figure

Sector

Construction

Browse related listings

Location

Romania

Publisher
Publications Office of the European Union
Record ID
430439-2025

Lifecycle

Tender closed on 23 Jul 2025. Awaiting award.

Closed
  1. Published2 Jul 20251 year ago
  2. Tender deadline23 Jul 202516 months ago

Brief

This contract involves the procurement and transportation of LED warning signal devices for marking dangerous curves and sectors on national roads and highways managed by the National Company for Road Infrastructure Administration (C.N.A.I.R. S.A.). The contract includes the supply, transport, and installation of the following LED devices: - Variable message signs with LEDs, which will be used to signal curves and will feature the A6a figure "Sequential Panels for Particularly Dangerous Curves" according to SR 1848-2:2011. These signs will be equipped with lighting devices to highlight the warning signals for road geometric elements, specifically the approach to curves. - Additional signaling devices with LEDs, which will be installed above existing road signs. Each device will have at least 2 LEDs, housed in an aluminum box, and will operate in a cascading manner to enhance the visibility of existing road signals. - Mounting/control systems and photovoltaic panels for the LED devices, ensuring the cascading operation of the variable message signs or additional signaling devices. According to Article 160, paragraph (1) of Law no. 98/2016, interested economic operators have the right to request clarifications or additional information regarding the award documentation up to 18 days before the deadline for submitting offers. The contracting authority will respond to all requests for clarification or additional information within a single deadline, 11 days before the offer submission deadline. This response time has been established to provide economic operators with adequate time to analyze the award documentation and subsequently prepare their offers based on the responses provided by the contracting authority.

Track record

Thin record. Only 2 prior awards here — too little to read.

2 awards · 2 winners

In transport logistics, NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA has awarded 2 contracts to 2 suppliers.

Who wins here

  1. Imeva S.P.A.1× · 50%
  2. IMEVA SPA1× · 50%

Across transport logistics, the most active winners are DENNIS EAGLE LIMITED, NORTHUMBRIA HEALTHCARE NHS FOUNDATION TRUST, LOOKERS GROUP — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA

4 listingsView all

Feasibility Study for Road Bridge Design Services in Suceava and Botosani

NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA

This contract involves the preparation of a feasibility study for the design of several road bridges in Romania. The project includes the following locations: Lot 1 - 1. Bridge on DN 2 at km 408+212 in Suceava; 2. Bridge on DN 2 at km 408+572 in Suceava; 3. Bridge on DN 2 at km 461+902 in Suceava; 4

ClosedConstructionRomaniaPublished 1 Mar 2026

est.RON 1,352,640Deadline 24 Mar 2026

Romania - National Road Maintenance Works - Framework Agreement for Summer Maintenance Works - Road Surface, Shoulders, Emergency Lanes, and Marking Lanes - D.R.D.P. TIMIȘOARA - S.D.N. TIMISOARA - YEAR I - II

NATIONAL COMPANY FOR ROAD INFRASTRUCTURE ADMINISTRATION SA

This framework agreement is for ongoing summer maintenance works, including the road surface, shoulders, emergency lanes, and marking lanes, managed by D.R.D.P. TIMIȘOARA and S.D.N. TIMISOARA for the first two years. Suppliers interested in this opportunity can request clarifications or additional i

ClosedConstructionRomaniaPublished 11 Feb 2026

Deadline 27 Mar 2026

Open in Construction

4 open listingsView all