This contract involves construction work that includes relocating transformers for internal needs, as well as the delivery, dismantling, and installation of current measuring transformers for the substation "Dolni Dabnik." The total value of the contract is approximately €21,300.42. Suppliers are in
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In construction, ELECTRICITY SYSTEM OPERATOR EAD has awarded 5 contracts to 4 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the design of a 110 kV substation named 'Beshovitsa' to connect the solar power plant 'Elidis Solar' and the associated electrical network, owned by 'ESP Elidis Solar Park' LLC. The contract also includes author supervision during the construction phase.
This public procurement contract is for providing insurance services for a duration of 48 months. The services include liability insurance for motorists, comprehensive insurance (Kasko), and accident insurance for vehicles, including motor vehicles, road vehicles, and specialized equipment owned by
This contract involves the procurement of approximately 2,970 voltage measuring transformers for medium voltage applications. The breakdown of the required transformers is as follows: 30 units of 7.2 kV transformers for indoor installation, with a transformation ratio of 6000/√3:100/√3:100/√3:100/3
This contract involves the execution of author supervision and, if necessary, the execution of geodetic surveys and the preparation of executive documentation for the project "Construction of a sewer system for the "Septemvriitsi" 110/20 kV substation." The project aims to ensure proper infrastructu
Civil engineering contractors can provide feedback on a new framework agreement through a Pre-Market Engagement questionnaire.
Open tender for gutter cleaning services at St Edmunds College, Cambridge, with submissions due by 28th September 2026 at noon.
Leeds City Council is installing protective earth mounding around Roundhay Park field boundaries to enhance safety, preserve heritage landscape, and prevent unauthorised access.
Fire safety remediation project for a 24-unit residential development in Monaghan, requiring installation of fire-stopping systems, upgraded fire-rated doors, cavity barriers, and improved compartmentation while maintaining resident occupancy.