NETWORK EXPLOITATION DISTRICT - MONTANA
This contract involves construction and installation work for replacing the foundations of equipment at the 110 kV substation in Bukyovtsi. The project aims to enhance the structural integrity and functionality of the substation, ensuring reliable power distribution. Suppliers are invited to submit
AwardedConstruction🇧🇬BulgariaPublished 14 Dec 2025
BGN 952,280
ELECTRICITY SYSTEM OPERATOR EAD
This contract involves construction work for the reconstruction of the 110 kV power line 'Bliznak'. The main activities related to the reconstruction include: - Dismantling of existing phase conductors and ground wire; - Dismantling of existing steel lattice towers; - Supply and installation of new
AwardedConstruction🇧🇬BulgariaPublished 26 Oct 2025
BGN 27,434,632
NETWORK EXPLOITATION DISTRICT - STARA ZAGORA
This contract involves construction work that includes the removal of an existing external fence and the installation of a new external fence along the property boundaries, totaling 470 meters in length, along with the necessary gates. Additionally, the project requires the removal of the existing i
AwardedConstruction🇧🇬BulgariaPublished 4 Sept 2025
BGN 509,617
NETWORK EXPLOITATION DISTRICT - STARA ZAGORA
This contract involves construction work that includes the removal of an existing external fence and the installation of a new external fence along the property boundaries, totaling 360 meters in length. Additionally, the existing internal fence of the 110 kV substation will be removed, and a new fe
AwardedConstruction🇧🇬BulgariaPublished 4 Sept 2025
BGN 350,992
NETWORK EXPLOITATION DISTRICT-VARNA
This contract involves construction work, specifically the repair of the roof of the 20 kV switchgear at the Kavarna substation. The total value of the contract is €29,637.50. Suppliers are invited to submit their proposals for this project, which is part of the broader construction sector. For more
AwardedConstruction🇧🇬BulgariaPublished 25 Aug 2025
BGN 29,638
NETWORK EXPLOITATION DISTRICT-VARNA
The main objective of this contract is to carry out construction and installation works, which include repairing the foundations of the 110 kV power line "Izgrev" by removing old concrete, replacing the grounding of existing steel lattice towers, and disposing of construction waste.
AwardedConstruction🇧🇬BulgariaPublished 10 Jul 2025
BGN 119,074
NETWORK EXPLOITATION DISTRICT - STARA ZAGORA
This contract involves construction work, including the dismantling of existing foundations and structures (platforms) at the 110 kV substation 'Samara'. New standard foundations will be built based on projects approved by ESO EAD, upon which galvanized metal structures (platforms) will be installed
AwardedConstruction🇧🇬BulgariaPublished 26 Jun 2025
BGN 1,547,679