This contract involves the development of mammal expert reports for the preparation of updated conservation task plans for Natura 2000 areas: Łęgi Odrzańskie, Rudawy Janowickie, Torfowiska Gór Izerskich, and Dolina Dolnej Kwisy. Key tasks include: 1) creating a fieldwork schedule; 2) conducting fiel
Contract awarded. Originally published 1 years ago.
This contract involves the removal of trees and shrubs, along with the resulting biomass, from a total area of 8.54 hectares located within Natura 2000 sites. The specific sites include Dobromierz, Góry Bialskie and Grupa Śnieżnika, Góry i Pogórze Kaczawskie, Masyw Chełmca, Ostoja nad Bobrem, Pasmo
This contract involves the development of a phytosociological and botanical expertise for creating an updated protection task plan for the Natura 2000 area 'Grądy in the Odra Valley' (PLH020017). Key tasks include: 1) preparing a schedule for fieldwork; 2) conducting an inventory of natural habitats
This contract involves conducting field studies, soil analyses, and preparing an environmental expertise report within the boundaries of the "Śnieżnik Kłodzki" nature reserve and its immediate vicinity. Key tasks include: 1) Conducting field studies, which involve: a) Identifying 25 research sites (
This contract involves the development of ornithological expertise to create updated conservation task plans for Natura 2000 areas: Mietków Reservoir PLB020004, Izera Mountains PLB020009, Table Mountains PLB020006, and Odra Valley Forests PLB020002. Key tasks include: 1) Developing a fieldwork sched
Produce a structured monitoring report synthesizing 2024 offshore survey data from South Rigg MCZ to assess habitat conditions, community structure, and progress toward conservation objectives.
TVCA seeks market input on a future consultancy contract for bus network planning, transport partnership development, and strategic transport policy support aligned with national integration strategy.
Conwy County Borough Council seeks a multi-disciplinary design team to lead the redevelopment of Block A at Ysgol Eirias school in Colwyn Bay, including design and demolition planning.
Partner required to manage void housing properties, clear spaces, and update energy meters for new tenant occupancy from mid-July 2026 through 2029.