This contract involves the upgrade and expansion of the 220/110 kV Toruń Elana substation. The modernization project includes the reconstruction of the 220 kV switchgear to a 2S configuration with tubular busbars for the system and link-type for individual fields, the construction of a new technolog
Tender closed on 22 May 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In construction, POLISH POWER GRID COMPANY has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the supply of a mobile field for electric power transmission and operation. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required characteri
This contract opportunity involves conducting inspections and providing repair services for DLF type circuit breakers at the PSE S.A. electrical substations. The contract is divided into five packages, each corresponding to a different operational area of PSE S.A.: a) Package I – Warsaw, b) Package
This contract involves the supply of a mobile field for the transmission and operation of electrical energy. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required
This contract involves the supply of current and voltage transformers for the equipment of the Ordering Party's stations. The contract is divided into five parts: - Part 1: Supply of transformers for the project: Expansion of the 400/110 kV Ełk Bis station along with the reconstruction of the 220/11
Procurement and installation of floodlighting and pedestrian lighting systems for Clare GAA Centre of Excellence in Caherlohan, County Clare.
Sealed tender opportunity to refurbish ground floor toilet facilities and cloakroom at a busy municipal arts centre in Didcot, Oxfordshire, including damp-proofing, cladding, electrical works, and cloakroom relocation.
Supply and assemble DUNE APA stainless steel frames across two lots: 30 frames in Lot 1 and 10 frames in Lot 2.
Contractor needed to install and replace pipework sections in the Brackloon/Spaddagh water supply system infrastructure project.