Skip to content
BidSonarBidSonar

Closed contract

Construction Work for the Upgrade and Expansion of the 220/110 kV Toruń Elana Substation

This contract involves the upgrade and expansion of the 220/110 kV Toruń Elana substation. The modernization project includes the reconstruction of the 220 kV switchgear to a 2S configuration with tubular busbars for the system and link-type for individual fields, the construction of a new technolog

Published 11 May 2025 · 1 year agoTED

Tender deadline passed on 22 May 2025.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

22 May 2025

1 year ago

Contract value

Not disclosed

Source did not declare a figure

Sector

Construction

Browse related listings

Location

Poland

Publisher
Publications Office of the European Union
Record ID
301021-2025

Lifecycle

Tender closed on 22 May 2025. Awaiting award.

Closed
  1. Published11 May 20251 year ago
  2. Tender deadline22 May 202518 months ago

Brief

This contract involves the upgrade and expansion of the 220/110 kV Toruń Elana substation. The modernization project includes the reconstruction of the 220 kV switchgear to a 2S configuration with tubular busbars for the system and link-type for individual fields, the construction of a new technology building, and the design and construction of a Bridge Rail along with obtaining necessary permits (DUŚ, DLS, and PnB). Additionally, the contract includes an Option for Supervision. Detailed requirements regarding this option are specified in Part IV of the SWZ. A comprehensive description of the contract's subject is available in Part II of the SWZ Functional-Utility Program. The Common Procurement Vocabulary codes relevant to this contract are: 45000000-7, 35100000-5, 45100000-8, 45200000-9, 45300000-0, 45400000-1, 45500000-2, 71200000-0, 71300000-1, 71400000-2, 71500000-3. In all cases where the contracting authority describes the subject of the contract by referring to standards, technical assessments, specifications, and reference systems, equivalent solutions are permitted if they achieve characteristics or parameters that are not worse than those specified. This means that the contractor may propose solutions described by the contracting authority or equivalent ones. According to Article 101, paragraph 5 of the law, a contractor who refers to equivalent solutions must demonstrate that the supplies, services, or construction works offered meet the requirements set by the contracting authority, provided that the contractor proves in the offer, particularly through the evidence mentioned in Articles 104-107 of the law, that the proposed solutions meet the requirements specified in the contract description.

Track record

Thin record. Only 2 prior awards here — too little to read.

2 awards · 2 winners

In construction, POLISH POWER GRID COMPANY has awarded 2 contracts to 2 suppliers.

Who wins here

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from POLISH POWER GRID COMPANY

4 listingsView all

Supply of Mobile Field for Electric Power Transmission and Operation

POLISH POWER GRID COMPANY

This contract involves the supply of a mobile field for electric power transmission and operation. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required characteri

ClosedEngineeringPolandPublished 10 Dec 2025

Deadline 21 Jan 2026

Electrical Equipment Repair and Maintenance Services

POLISH POWER GRID COMPANY

This contract opportunity involves conducting inspections and providing repair services for DLF type circuit breakers at the PSE S.A. electrical substations. The contract is divided into five packages, each corresponding to a different operational area of PSE S.A.: a) Package I – Warsaw, b) Package

ClosedFacilities ManagementPolandPublished 4 Dec 2025

Deadline 17 Dec 2025

Supply of Current and Voltage Transformers – Stage 10

POLISH POWER GRID COMPANY

This contract involves the supply of current and voltage transformers for the equipment of the Ordering Party's stations. The contract is divided into five parts: - Part 1: Supply of transformers for the project: Expansion of the 400/110 kV Ełk Bis station along with the reconstruction of the 220/11

ClosedEngineeringPolandPublished 13 Nov 2025

Deadline 4 Dec 2025

Open in Construction

4 open listingsView all