This contract involves the supply of current and voltage transformers for the equipment of the Ordering Party's stations. The contract is divided into five parts: - Part 1: Supply of transformers for the project: Expansion of the 400/110 kV Ełk Bis station along with the reconstruction of the 220/11
Tender closed on 4 Dec 2025. Awaiting award.
No single supplier dominates the field.
In engineering, POLISH POWER GRID COMPANY has awarded 4 contracts to 4 suppliers.
Across engineering, the most active winners are BRODOMERKUR ENERGETIKA d.o.o., DRIBO, spol. s r.o., SUNBELT RENTALS LIMITED — the field to beat, or your route in as a partner.
This contract involves the supply of a mobile field for electric power transmission and operation. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required characteri
This contract opportunity involves conducting inspections and providing repair services for DLF type circuit breakers at the PSE S.A. electrical substations. The contract is divided into five packages, each corresponding to a different operational area of PSE S.A.: a) Package I – Warsaw, b) Package
This contract involves the supply of a mobile field for the transmission and operation of electrical energy. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required
This contract involves the supply of current and voltage transformers for the equipment of the Ordering Party's stations. The contract is divided into five parts: - Part 1: Supply of transformers for the project: Expansion of the 400/110 kV Ełk Bis station along with the reconstruction of the 220/11
Validate measurement techniques for aluminium waveguide straightness and cylindricity assessment.
Engage a consulting engineer to assess, design, and oversee the integration of two group water schemes into the public water supply system and manage their statutory transfer to Uisce Éireann.
TFWRL is seeking to install a centralized fluid delivery and waste oil collection system across five maintenance points in their depot to replace manual bowser transport methods.
Design concept study for moveable shielding system for the UK's prototype fusion energy plant at West Burton.