Skip to content
BidSonarBidSonar

Closed contract

Renovation of Doors and Windows at Bonn University Hospital

The Bonn University Hospital (UKB) is located on a 43-hectare site on Venusberg. The campus features new buildings for Neurology, Psychiatry, and Palliative Medicine (NPP) and existing structures for Neurosurgery and Epileptology, contributing to a significant neuroscience focus at the University of

Published 27 Apr 2025 · 1 year agoTED

Tender deadline passed on 26 May 2025.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

26 May 2025

1 year ago

Contract value

est.€743,000

Euros

Sector

Construction

Browse related listings

Location

Germany

Publisher
Publications Office of the European Union
Record ID
270297-2025

Lifecycle

Tender closed on 26 May 2025. Awaiting award.

Closed
  1. Published27 Apr 20251 year ago
  2. Tender deadline26 May 202518 months ago

Brief

The Bonn University Hospital (UKB) is located on a 43-hectare site on Venusberg. The campus features new buildings for Neurology, Psychiatry, and Palliative Medicine (NPP) and existing structures for Neurosurgery and Epileptology, contributing to a significant neuroscience focus at the University of Bonn. This focus has developed into an internationally recognized center, especially in collaboration with the German Center for Neurodegenerative Diseases (DZNE) and the Max Planck Society's caesar research center. The current layout of the hospital needs reorganization due to issues such as inefficient infrastructure, long transport routes, and small units caused by the existing building structure. A master plan has been developed to enhance the hospital's competitiveness and future viability, with annual updates to adapt to new findings. The NPP project is a key milestone in centralizing hospital operations on the Venusberg campus. Essential healthcare functions will be relocated from the existing Neurology building (Building 082) to the new NPP building, freeing up significant space for future use. This project includes planning for the renovation and repurposing of the existing spaces, primarily for laboratory use, to meet the urgent need for research facilities. The Neurocenter complex, which includes Buildings 81 and 82, was established from a competition in the late 1950s, with the first phase completed in 1965. The buildings have many interior rooms without natural light, affecting working conditions. The project aims to address the need for research space while minimizing construction work. An open procedure will initially focus on the hazardous material remediation work.

Track record

Thin record. Only 1 prior award here — too little to read.

1 award · 1 winner

In construction, UNIVERSITY HOSPITAL BONN AR has awarded 1 contract to 1 supplier.

Who wins here

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from UNIVERSITY HOSPITAL BONN AR

4 listingsView all

Network Technology Renovation at Bonn University Hospital

UNIVERSITY HOSPITAL BONN AR

The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the electrical supply due to fire safety deficiencies. The first construction phase involves renewing the low-voltage main distribution in the 3rd basement level. Preparat

ClosedConstructionGermanyPublished 15 Dec 2025

Deadline 18 Dec 2025

Installation of Heating, Ventilation, and Air Conditioning Systems

UNIVERSITY HOSPITAL BONN AR

The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the electrical supply due to fire safety deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Prepa

ClosedConstructionGermanyPublished 8 Dec 2025

Deadline 13 Jan 2026

Construction Work for Electrical System Renovation at Bonn University Hospital

UNIVERSITY HOSPITAL BONN AR

The Bonn University Hospital is planning fire protection and functional upgrades for Building 22 / OPZ. This project involves renovating the electrical supply due to existing fire safety deficiencies. As part of the fire protection renovation of the entire Operational Center, the anesthesia departme

ClosedConstructionGermanyPublished 7 Dec 2025

Deadline 8 Jan 2026

Germany – Construction Works – OPZ - Partial Renovation: Network Technology Ground Floor

UNIVERSITY HOSPITAL BONN AR

The University Hospital Bonn is planning fire protection and functional upgrades for Building 22 / OPZ. This includes renovating the power supply due to fire protection deficiencies. In the first construction phase, the low-voltage main distribution (NSHV) in the 3rd basement will be renewed. Prepar

ClosedConstructionGermanyPublished 3 Dec 2025

Deadline 8 Jan 2026

Open in Construction

4 open listingsView all