A United Kingdom supplier, with 17 awarded contracts, totalling £1.2m, most recently 5 days ago.
Excavate and reinstate 3 trial pits at Anstey Mill Lane Crossing to locate and map underground utility apparatus as part of the Generation 5 Civil Engineering Framework.
Design and construct two SuDS build-outs with below-ground attenuation infrastructure at Westborn Road in Fareham as part of a sustainable drainage pilot programme.
Civil engineering works to design, install, and coordinate a new pedestrian crossing on Sherborne Road under the Generation 5 framework.
Construct a zebra crossing with resurfacing and kerb realignment at Sandy Lane and Oakwood junction in Church Crookham under the Generation 5 Highways Framework.
Opportunity to develop a shared use facility on third-party land next to Woodhouse Lane in Hedge End through the Generation 5 Civil Engineering Framework.
Site investigation services required for Hamble Lane Bus Gate project, including drainage surveys, GPR surveying, trial holes, and traffic management.
Supply of traffic management services for concurrent topographical and arboricultural surveys at B3011 road junction, Heckfield.
Construction of two zebra crossings on Reading Road South in Fleet with tactile paving upgrades and asphalt resurfacing on related approaches.
Construction of three cycle by-passes with island features, road markings, and signage on Whichers Gate Road in Rowlands Castle.
Construct footpaths, kerbs, and resurface Cove Road (A3013) with fencing installation under the Generation 5 Civil Engineering Framework.