POLSKA GRUPA GRNICZA SA
A United Kingdom buyer, with 49 published contracts, worth £88.2m, most recently 3 months ago.
Top 5 suppliers won 69% of awarded value — £73.5m of £106.7m across 50 awards.
This contract involves the supply of steel anchors for rock stabilization for the branches of Polska Grupa Górnicza S.A. The specific requirements and details can be found in the Specification of Contract Conditions (SWZ). The total value of the contract is approximately 1,400,064.81 PLN. Suppliers
This procurement opportunity is for a framework agreement to provide repair services for various types of mining equipment used by Polska Grupa Górnicza S.A. The contract is divided into ten specific tasks, including the repair of components and engines from different manufacturers such as PIOMA, SC
This contract opportunity involves the modernization of the hoisting machine at the 'Piotr' shaft in the eastern section, specifically for the needs of PGG S.A. at the Mysłowice-Wesoła coal mine. Suppliers are invited to review the detailed specifications in the attached document. The deadline for s
This contract involves the supply of standard rubber conveyor belts and fire-resistant conveyor belts for surface use by the Polish Mining Group S.A. The contract is divided into tasks, with specific types and quantities detailed in the Offer Form, which is Annex 2 to the Terms of Reference.
The Polish Mining Group S.A. is seeking suppliers to provide repair and maintenance services for electric motors. This contract is divided into specific tasks, allowing for focused proposals. Suppliers will be responsible for ensuring the efficient operation of electric motors used in mining operati
This procurement opportunity is for a framework agreement to provide repair services for various types of mining equipment used by Polska Grupa Górnicza S.A. The contract is divided into ten specific tasks, including the repair of components and engines from different manufacturers such as PIOMA, SC
The Polish Mining Group S.A. is seeking suppliers for the delivery of hook screws with nuts. Detailed specifications can be found in the Terms of Reference (SWZ). This contract is part of the construction sector and is published on the TED platform. The deadline for submissions is July 11, 2025. For
This contract involves a framework agreement for providing maintenance and repair services for the owned longwall shearers of Polska Grupa Górnicza S.A. The work is divided into two tasks: Task 1 focuses on servicing the longwall shearers owned by Grenevia S.A., and Task 2 involves servicing the lon
This contract opportunity involves the lease of two 130 kW continuous miners, including supporting equipment and control systems for drilling at an angle of up to -35°. The lease also includes full warranty and service support throughout the lease period. This is for the needs of Polska Grupa Górnic
This contract involves the collection, transportation, and processing of up to 1,369,179 tons of mining waste from coal extraction and processing. The work includes: 1. Collection of waste from a railway unloading ramp, with approximately 90% (1,232,261.1 tons) being mining waste and 7-10% being fil