A United Kingdom supplier, with 4 awarded contracts, totalling £76.9m, most recently 9 months ago.
This procedure aims to achieve the investment objective of "Construction of a 6.8 MW Solar Power Plant". The main goal pursued by the Beneficiary is to produce electricity from renewable sources by installing new renewable energy production capacities for self-consumption, intended for administrativ
The contract involves the construction of a photovoltaic power plant (turnkey) and its connection to the National Energy System, with a minimum installed capacity of 1.155 MW, by the Municipality of Galați, located in Galați municipality, Micro 17, Prelungirea Brăilei Street, Lot 1,2, near the Beltw