Ireland – Construction Work – 220kV Oil-XLPE Transition Joint Installation
Installation of a 220kV Oil-XLPE transition joint for the Inchicore-Poolbeg No.1 transmission line in Ireland.
AwardedConstructionIrelandPublished 25 Jun 2026
Buyer
A buyer in Ireland, with 15 published contracts, worth £2.8m, most recently on 12 Nov 2026.
We'll email you when they publish a tender or award a contract · Free · No card
Contracts issued
15
in notices BidSonar tracked itself
Value published
€255.4m+ 25.5m currency not stated · £2.8m
the value those notices declare
Published 15
Top 5 suppliers won 100% of awarded value — €255.4m of €255.4m across 14 awards.
1 contractlast won 9 Jul 2026Strongest in Engineering
€244m
96%
1 contractlast won 23 Sept 2026Strongest in Engineering
€5.6m
2%
1 contractlast won 13 Jul 2026Strongest in Engineering
€3.3m
1%
1 contractlast won 11 Sept 2026Strongest in Education & Training
€1.3m
<1%
1 contractlast won 3 Jul 2026Strongest in Engineering
€1.2m
<1%
Installation of a 220kV Oil-XLPE transition joint for the Inchicore-Poolbeg No.1 transmission line in Ireland.
AwardedConstructionIrelandPublished 25 Jun 2026
ESB Ireland is seeking suppliers for standby generator equipment and installation services at multiple premises locations.
AwardedEngineeringIrelandPublished 12 Jun 2026
The Electricity Supply Board of Ireland is seeking suppliers for the provision of operating rods and adaptors used in overhead electrical equipment. This contract, identified as D20/CON/1093, has a total value of approximately €2,884,783. Suppliers interested in this opportunity can find more detail
AwardedEngineeringIrelandPublished 19 Aug 2025
The Electricity Supply Board is seeking suppliers for the construction of heavy goods vehicle (HGV) truck bodies under contract D20/CON/1120. This contract has a total value of €20,000,000 and aims to provide high-quality vehicle bodies for their fleet. Interested suppliers can find more details and
AwardedTransport & LogisticsIrelandPublished 15 May 2025