DB INFRAGO AG GESCHFTSBEREICH FAHRWEG BUKR 16
A United Kingdom buyer, with 182 published contracts, worth £406.3m, most recently 4 months ago.
Top 5 suppliers won 100% of awarded value — £812.6m of £812.6m across 182 awards.
This contract involves the construction of a railway bridge at km 0.980 on the Nürnberg Rbf - Dutzendteich route. The bridge will cross railway lines 5962 and 5963, which connect Nürnberg Rbf to Dutzendteich and Nürnberg-Reichswald, respectively. Due to the poor structural condition of the existing
This contract involves the replacement of tracks on Haltern lines 5, 6, 7, 8, and 17, as well as the renewal of switches 26 to 29. The work is part of a larger construction project aimed at improving rail infrastructure. Suppliers are invited to provide the necessary materials and services for this
This contract involves the construction of railway lines in Germany, specifically for the sections between Gelbensande and Rövershagen, and Rövershagen to Bentwisch. The work includes the construction of tracks over specified kilometers, aiming to enhance the railway infrastructure in the region. Su
This contract involves the renewal of two railway overpasses constructed of reinforced concrete along route 5903. The work is divided into two lots: Lot 1 is located at kilometer 83.891 near Höflas, and Lot 2 is at kilometer 86.709 near Vorbach. Suppliers are invited to submit bids for the construct
This contract involves the supervision of the renewal of the railway bridge located at Lüghauser Straße 2655, km 16.080 in Rösrath. The work will ensure that the project meets safety and quality standards, and it is essential for maintaining the infrastructure of the railway network. Suppliers are i
This contract involves a framework agreement for non-destructive testing using Ultrasonic Testing (UT) and Eddy-Current Testing (ET) systems on a rail testing vehicle. The work includes the installation of a Sperry Inspector System on a flat wagon provided by InfraGO (Y25 bogie with disc brakes) and
This contract involves the renewal of railway tracks in the Knauthain-Pegau area, specifically between kilometers 17.0 to 22.1 and 22.1 to 17.0. The work is scheduled to take place during a total closure of 25 days in October 2025. Key tasks include: - Renewal of both continuous track lines, - Insta
This contract involves the electrification and expansion of the Hochrhein Railway between Basel Badischer Bahnhof and Erzingen, covering the section from km 270.398 to km 345.768. The project aims to fully electrify this segment and enhance the regional rail passenger transport services. Almost all
This contract involves the upgrade of the SpDrS60 railway control system in Landau (Isar). The work includes adapting the interface for level crossings at points 40.0 and 40.7 km. Suppliers are invited to provide the necessary equipment and services to ensure the effective implementation of this upg
This contract opportunity involves the monitoring of construction sites for noise remediation in the regions of Löhne West, Hameln, Bad Pyrmont, and Bissendorf 2. Suppliers are invited to provide services related to overseeing construction activities, ensuring compliance with noise reduction regulat