DB INFRAGO AG GESCHFTSBEREICH FAHRWEG BUKR 16
A United Kingdom buyer, with 182 published contracts, worth £406.3m, most recently 4 months ago.
Top 5 suppliers won 100% of awarded value — £812.6m of £812.6m across 182 awards.
This contract involves construction work on the railway infrastructure between Hildesheim and Harsum, specifically between kilometers 40.097 and 35.348. The work includes various tasks related to the railway track, excluding bridges, tunnels, shafts, and underpasses. Suppliers are invited to provide
This contract involves the planning and preliminary design (Phases 1 and 2) for the expansion of the S-Bahn lines between Fürth-Eltersdorf (Line 5972) and Nürnberg-Erlangen (Lines 5900/5919). The project aims to explore alternatives and variations for the S-Bahn rerouting and the bundling route, in
This contract involves the planning-related construction supervision for several i2030 projects of the S-Bahn Berlin. The projects included in this procurement are: Schönholz parking facility, Südkreuz parking facility, Bundesplatz parking facility, Frohnau parking facility, Waidmannslust parking fa
This contract involves the renewal of railway tracks and switches along the Amberg-Neukirchen route, specifically between kilometers 45.971 and 66.258. The work is being conducted by DB InfraGO AG, and the awarded supplier for this project is Rohde Bahnbau GmbH & Co. KG. Suppliers interested in this
This contract opportunity involves providing construction supervision services for the robust network switch connection at the Storm branch. Suppliers are invited to submit their proposals for overseeing the construction work, ensuring compliance with safety and quality standards. The work will focu
This contract opportunity involves comprehensive planning services for the construction of office buildings (Operational Location - BSO) and technical buildings (Technical Location - TSO) as part of the operational control strategy of DB InfraGO AG. The planning services requested are specifically f
This contract opportunity involves the renewal of the railway overpass at Schlangenhecke on route 2324, specifically at railway kilometer 50.209 in Leverkusen. The work includes object planning, construction engineering services (phases 1-4), and optional services for phases 6-7. Additionally, it co
The project, located in Hamburg, is part of the federal demand plan and involves the construction of a new platform, a storage facility, a logistics area with rail connection, a double-track expansion, and a digital signal box. Currently, the projects are in performance phases 1 and 2. Quality assur
This contract opportunity involves the supply and installation of railway control equipment for speed enhancement on a specific railway line. The project includes the design, material provision, delivery, and installation of LST components, such as the new signal r102, which the bidder is responsibl
This contract involves noise reduction work on existing railway tracks managed by the Federal Railways in Germany. The project specifically focuses on implementing noise protection measures in the town of Bad Pyrmont along railway line 1760. Key components of the work include the installation of noi