Skip to content
BidSonarBidSonar

Closed contract

Materials Recycling Facility Plant Upgrade in Exeter

Exeter City Council is inviting tenders for the design, supply, and installation of a new materials recycling facility capable of processing 10,500 tonnes of mixed dry recyclables annually.

Published 22 May 2026 · 6 months agoFind a Tender

View on sourceFind a Tender

Original closed notice on the publisher's site

Closing date

Not published

No closing date published

Contract value

est.£6,000,000

Pounds sterling

Sector

Manufacturing

Browse related listings

Location

United Kingdom

England

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-0544d7

Lifecycle

No longer open. Published 6 months ago.

Closed

22 May 2026

Closed — no tender deadline was published

Brief

Exeter City Council is seeking a contractor to design, supply, and install a new Materials Recycling Facility (MRF) processing line at its Exton Road depot in Marsh Barton, Exeter. The facility will process 10,500 tonnes per annum of co-mingled or source-separated mixed dry recyclable material over one 7.5-hour shift, operating 5 days per week. The project aims to promote sustainable waste management practices and provide cost-effective recycling services to local authorities and organizations across Exeter and surrounding areas. Key performance requirements include: minimum 95% recyclable purity rate by weight, maximum 3% contamination by weight in recovered products, minimum throughput of 7 tonnes per hour, and 95% plant availability during operating hours. The contract will be awarded through a Competitive Flexible Procedure, with potential modifications allowed as outlined in the Procurement Act 2023.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from Exeter City Council

4 listingsView all

Open in Manufacturing

4 open listingsView all

Atmospheric Batch Semiconductor Furnaces

UNIVERSITY OF WARWICK

University of Warwick is purchasing two independent semiconductor furnace systems for nanofabrication research, available as separate lots for high-temperature oxidation/annealing and inert gas annealing applications.

ManufacturingUnited KingdomPublished 25 Nov 2026

Deadline 21 Dec 2026