Wooden Boardwalk Removal and Replacement Project in Scragh Bog, Ireland
Reconstruction of a 250-metre FSC Douglas Fir boardwalk at Scragh Bog, Ireland, including removal of existing structure, installation of crossings and passing points, and placement of benches.
This project involves the complete removal and hand-built reconstruction of a 250-metre wooden boardwalk at Scragh Bog, Ireland. The boardwalk will be constructed using FSC-certified Douglas Fir timber to ensure environmental sustainability. The removal phase includes extracting all embedded wooden support posts. The reconstruction will feature 2 boardwalk crossings, 3 passing points for pedestrian traffic flow, and 4 wooden benches for visitor amenities. Contractors should have experience in boardwalk construction, timber installation, and site restoration work using hand-building techniques.
Track record
Open field. No single supplier dominates the field.
7 awards · 6 winners
In construction, DEPARTMENT OF HOUSING LOCAL GOVERNMENT AND HERITAGE has awarded 7 contracts to 6 suppliers.
Qualified contractors are sought to remove and rebuild a 250-metre wooden boardwalk with crossings, passing points, and benches at Scragh Bog, Ireland.
Invasive plant eradication contract for Rhododendron ponticum and Cotoneaster removal at Killarney National Park, a 10,000-hectare protected conservation area in County Kerry, Ireland.
AwardedAgriculture & Food🇮🇪IrelandPublished 17 Nov 2026
Supply and install interpretative and wayfinding signage at Connemara National Park's Letterfrack Campus under a framework agreement call-off contract.
AwardedTransport & Logistics🇮🇪IrelandPublished 17 Nov 2026
STFC seeks a principal contractor to manage roof, window, and enabling works on a historic listed building at Royal Observatory Edinburgh while achieving net zero refurbishment goals.
Wealden District Council requires a Main Contractor to enhance Vicarage Field in Hailsham with new paving, drainage, landscaping, lighting, and security infrastructure while maintaining retail access.
OpenConstruction🇬🇧United KingdomPublished 24 Nov 2026
Phase 2 culvert replacement and restoration project for Peoples Gardens in Dublin's Phoenix Park, including landscaping, playground reinstatement, and pedestrian path reconstruction.
Construction🇮🇪IrelandPublished 24 Nov 2026
Nominal value — the true amount was likely withheld by the publisher.Deadline 14 Dec 2026