    ContractsBulk Excavation for Sizewell C Nuclear Plant
    Closed contract

    Bulk Excavation for Sizewell C Nuclear Plant

    Contract value
    £250m
    Closed 31 Oct 2025

    This contract opportunity involves the bulk excavation of various materials, including made ground, alluvial deposits, and crag sand, from the Main Construction Area (MCA) for the Sizewell C nuclear plant. The excavated materials will be transported to designated stockpiles or disposal areas within

    🇬🇧United KingdomPublished 17 Oct 2025· 11 months agoviaContracts Finder
    Contract value
    £250m
    Closed 31 Oct 2025
    Tender deadline passed on 31 Oct 2025.

    Decision brief

    4 fields
    • Contract value
      est.£250,000,000
      Pounds sterling
    • Tender closed
      31 Oct 2025
      11 months ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇬🇧United Kingdom

    Lifecycle

    Closed

    Tender closed on 31 Oct 2025. Awaiting award.

    17 Oct 2025Today31 Oct 2025

    Brief

    This contract opportunity involves the bulk excavation of various materials, including made ground, alluvial deposits, and crag sand, from the Main Construction Area (MCA) for the Sizewell C nuclear plant. The excavated materials will be transported to designated stockpiles or disposal areas within the Temporary Construction Area (TCA). The work is essential for preparing the site for the foundations of the nuclear plant's Units 1 and 2. Key tasks include: - Excavating and loading materials into transport vehicles, typically 45-ton all-terrain dump trucks. - Assessing the suitability of excavated materials, including necessary testing. - Managing vehicles and equipment within the MCA to ensure efficient operations. - Transporting materials to storage or disposal locations using a dedicated heavy haul road. - Ensuring compliance with quality specifications through testing and management of stockpiles. The total volume of materials to be excavated includes: - Made Ground (including Crag Sand): 912,000 m³ - Alluvial Deposits (including peat): 914,000 m³ - Crag Sand: 1,443,000 m³ This project is crucial for the timely construction of the nuclear plant, with the goal of starting construction on Units 1 and 2 as soon as possible.

    More from SIZEWELL C LIMITED

    4 listingsView all →
    Construction🇬🇧United Kingdom

    Traceability System for Precast Concrete Tunnel Segment Supply Chain

    Develop an integrated traceability and monitoring system to manage the complete lifecycle of 39,000 precast concrete tunnel segments from manufacturing through installation.

    est.£500,000SIZEWELL C LIMITED
    Published 12 Aug 2026
    Engineering🇬🇧United Kingdom

    Electrical Power Distribution Network Design for Tunnel Construction Site

    Design and deliver a complete electrical power distribution system including HV/LV networks, substations, and site lighting for a major tunnel construction project in compliance with British electrical standards.

    est.£100,000SIZEWELL C LIMITED
    Published 10 Aug 2026
    Construction🇬🇧United Kingdom

    End-to-End Tunnel Segment Production Monitoring and Traceability System

    Develop an integrated monitoring system to track and manage 39,000 precast concrete tunnel segments from production through installation across multiple facilities and transportation modes.

    est.£500,000SIZEWELL C LIMITED
    Published 6 Aug 2026
    Construction🇬🇧United Kingdom

    Reinforcement Cut and Bend Facility for Sizewell C Project

    Sizewell C Limited is seeking suppliers to establish an onsite facility for cutting and bending reinforcement bars (rebar) for the Sizewell C nuclear project. This facility will process approximately 238,000 tons of rebar and coil throughout the project duration, with a peak production capacity of 5

    est.£20,000,000SIZEWELL C LIMITED
    Published 6 Nov 2025

    Open in Construction

    4 open listingsView all →
    Construction🇮🇪Ireland

    Interior Alterations and Upgrades to Unit 2 at Carlow Community Enterprise House

    Contract for interior demolition, alteration, and mechanical/electrical upgrades to Unit 2 at Carlow Community Enterprise House.

    Carlow Community Enterprise Centres CLG
    Published 2 Oct 2026
    OpenConstruction🇬🇧United Kingdom

    Developer Partner Needed for Brimscombe Port Redevelopment in Stroud, Gloucestershire

    Stroud District Council is seeking a developer partner to redevelop Brimscombe Port, a historic ten-acre site combining canal reinstatement with mixed-use residential development.

    est.£50,000,000Stroud District Council
    Published 2 Oct 2026
    Construction🇬🇧United Kingdom

    Air Source Heat Pump Installation at Hendre Ladus, Ystradgynlais

    Powys County Council seeks a contractor to design, supply, and install an air source heat pump heating system with completion required by February 2027.

    est.£220,000Powys County Council
    Published 2 Oct 2026
    OpenConstruction🇬🇧United Kingdom

    Developer Partner Needed for Brimscombe Port Redevelopment in Gloucestershire

    Stroud District Council seeks a developer partner to deliver a mixed-use residential development with canal restoration at the historic 10-acre Brimscombe Port site in Gloucestershire.

    est.£50,000,000Stroud District Council
    Published 2 Oct 2026
    Take action
    View on sourceContracts Finder

    Original closed notice on the publisher's site

    Publisher
    UK Cabinet Office
    Licence
    OGL v3.0
    Source
    contractsfinder.service.gov.uk
    Record ID
    ef6a25d6-3920-48e4-8b5c-c00d3aea1d6e
    SC
    Buyer
    SIZEWELL C LIMITED
    Sector
    Construction