Open tender

Traceability System for Precast Concrete Tunnel Segment Supply Chain

Tender closes
3d
14 Aug 2026 · in 2 days

Develop an integrated traceability and monitoring system to manage the complete lifecycle of 39,000 precast concrete tunnel segments from manufacturing through installation.

United KingdomPublished 12 Aug 2026· TodayContracts Finder
Closing in 3 days tender deadline on 14 Aug 2026

Decision brief

4 fields
  • Contract value
    est.£500,000
    Pounds sterling
  • Tender closes
    14 Aug 2026
    3 days left
  • Sector
    Browse related listings
  • Location
    United Kingdom

Lifecycle

3d left

3 days left to bid — closing this week. Opened today, deadline 14 Aug 2026.

12 Aug 202614 Aug 2026

Brief

This opportunity involves developing and implementing a comprehensive monitoring and traceability system for the production, logistics, and installation of approximately 39,000 precast concrete tunnel segments. The segments are manufactured at Avonmouth, transported via multi-modal logistics (truck and rail), stored across four facilities (TPF, Railhead, ACA, and TLC), and installed in three tunnel boring machines (TBMs) serving two intake tunnels and one outfall tunnel. The solution must provide complete end-to-end visibility from casting through installation, enabling real-time tracking, quality assurance, inventory management, and reporting across all supply chain partners. Key requirements include eliminating reporting gaps, improving quality traceability, resolving inventory discrepancies, preventing installation errors, avoiding segment duplication, and maintaining transparency with all stakeholders. Suppliers with expertise in supply chain visibility, asset tracking, quality management systems, or logistics coordination are encouraged to submit proposals.

More from SIZEWELL C LIMITED

4 listingsView all →
EngineeringUnited Kingdom

Electrical Power Distribution Network Design for Tunnel Construction Site

Design and deliver a complete electrical power distribution system including HV/LV networks, substations, and site lighting for a major tunnel construction project in compliance with British electrical standards.

est.£100,000SIZEWELL C LIMITED
Published 10 Aug 2026
ConstructionUnited Kingdom

End-to-End Tunnel Segment Production Monitoring and Traceability System

Develop an integrated monitoring system to track and manage 39,000 precast concrete tunnel segments from production through installation across multiple facilities and transportation modes.

est.£500,000SIZEWELL C LIMITED
Published 6 Aug 2026
ConstructionUnited Kingdom

Reinforcement Cut and Bend Facility for Sizewell C Project

Sizewell C Limited is seeking suppliers to establish an onsite facility for cutting and bending reinforcement bars (rebar) for the Sizewell C nuclear project. This facility will process approximately 238,000 tons of rebar and coil throughout the project duration, with a peak production capacity of 5

est.£20,000,000SIZEWELL C LIMITED
Published 6 Nov 2025
ConstructionUnited Kingdom

Bulk Excavation for Sizewell C Nuclear Plant

This contract opportunity involves the bulk excavation of various materials, including made ground, alluvial deposits, and crag sand, from the Main Construction Area (MCA) for the Sizewell C nuclear plant. The excavated materials will be transported to designated stockpiles or disposal areas within

est.£250,000,000SIZEWELL C LIMITED
Published 17 Oct 2025

Open in Construction