Sizewell C Limited is seeking a contractor to design, build, operate, maintain, and eventually decommission a fuel distribution facility on-site, with work expected to start in 2026. This facility will be responsible for receiving and storing fuels and lubricants, including heavy plant and vehicle f
Tender closed on 28 May 2025. Awaiting award.
Develop an integrated traceability and monitoring system to manage the complete lifecycle of 39,000 precast concrete tunnel segments from manufacturing through installation.
Design and deliver a complete electrical power distribution system including HV/LV networks, substations, and site lighting for a major tunnel construction project in compliance with British electrical standards.
Develop an integrated monitoring system to track and manage 39,000 precast concrete tunnel segments from production through installation across multiple facilities and transportation modes.
Sizewell C Limited is seeking suppliers to establish an onsite facility for cutting and bending reinforcement bars (rebar) for the Sizewell C nuclear project. This facility will process approximately 238,000 tons of rebar and coil throughout the project duration, with a peak production capacity of 5
DFE Energy Group requires a specialist to conduct compliance inspections at all Northern Ireland Non-Domestic RHI scheme installations during closure and produce detailed inspection reports.
Supply of electricity to multiple Authority sites with invoicing and customer query management services.
Tender for gas supply services across multiple Education Training Collective sites in the Tees Valley.
Supply framework for bulk fuel delivery to multiple council sites across Pembrokeshire and Carmarthenshire counties.