    ContractsReplacement of Circuit Breakers for Moyle Interconnector HVDC Link
    Open tender

    Replacement of Circuit Breakers for Moyle Interconnector HVDC Link

    Procurement opportunity to design, supply and install replacement 275 kV circuit breakers for the Moyle Interconnector HVDC link connecting Northern Ireland and Scotland, with initial replacement of four breakers planned for 2028-2029.

    🇬🇧United Kingdom· Northern IrelandPublished 9 Nov 2026· TodayviaFind a Tender

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Closing date
      Rolling
      No closing date published
    • Sector
      Engineering
      Browse related listings
    • Location
      🇬🇧United Kingdom
      Northern Ireland

    Lifecycle

    Open

    Open tender — no closing date published. Opened today.

    9 November 2026
    Open tender · no closing date published

    Brief

    Mutual Energy Limited (MEL) operates the 500MW Moyle Interconnector, a High Voltage Direct Current (HVDC) link commissioned in 2001 that connects Northern Ireland and Scotland. This interconnector is critical infrastructure for Northern Ireland's electricity grid. The Moyle Interconnector contains seventeen 275 kV circuit breakers across two converter stations. The original Siemens 3AQ2-EE circuit breakers, installed in 2001, are now approaching the end of their serviceable life and require replacement. This procurement seeks suppliers to replace circuit breakers and potentially upgrade system performance. The initial scope includes four converter pole circuit breakers (two at each station), with possible future replacement of up to thirteen additional filter, transmission line and busbar coupler circuit breakers. Key requirements include: design, engineering, manufacture, supply, installation, testing and commissioning; demonstration of compliance with electrical ratings and project-specific Transient Recovery Voltage (TRV) duties; controlled-switching and Point-on-Wave capability; factory inspection and testing; delivery and logistics; assessment of compatibility with existing infrastructure; civil, structural, electrical, protection and control modifications; and provision of training, spares, specialist tools and technical support. The replacement addresses the age and condition of existing equipment while providing an opportunity to improve controlled energisation performance for converter transformers. Studies have identified enhanced TRV requirements due to low short-circuit ratio on the Scottish grid side, which the replacement solution must accommodate. The initial four circuit breakers are scheduled for replacement during planned summer outages in 2028 and 2029. Final scope, technical solution and procurement structure will be informed by market engagement and subject to relevant approvals.

    More from MOYLE INTERCONNECTOR LIMITED

    1 listingView all →
    AwardedIT & Software🇬🇧United Kingdom

    Cyber Security Support Services for Power Interconnector Control Systems

    Moyle Interconnector Limited is seeking enhanced cyber security support services to protect critical control systems at converter stations in Northern Ireland and Scotland and meet NIS Regulations compliance requirements.

    £400,000MOYLE INTERCONNECTOR LIMITED
    Published 11 Jun 2026

    Open in Engineering

    4 open listingsView all →
    OpenEngineering🇬🇧United Kingdom

    Vehicle Pricing Data and VIN Decoder Services

    The Department for Transport seeks suppliers for vehicle pricing data and a VIN decoder tool to support the new car market analysis.

    £110,000indicativeDepartment for Transport
    Published 9 Nov 2026
    Engineering🇬🇧United Kingdom

    Lakes College Rooftop Air Handling Units Supply and Installation

    Lakes College is inviting tenders for the supply and installation of rooftop air handling units with associated remedial works.

    est.£450,000Lakes College West Cumbria
    Published 9 Nov 2026
    Engineering🇬🇧United Kingdom

    Install River Temperature Sensors at Nine Environment Agency Sites in Northeast England

    Supply and install river temperature sensors at nine Environment Agency monitoring sites in Northeast England by March 2027.

    est.£50,000ENVIRONMENT AGENCY
    Published 9 Nov 2026
    Engineering🇬🇧United Kingdom

    Architect and Principal Designer for Heritage Building Conservation Project

    Thetford Town Council seeks a multidisciplinary architect to lead design and conservation work on a heritage building project targeting National Lottery Heritage Fund funding.

    Thetford Town Council
    Published 9 Nov 2026
    Take action
    View tender on sourceFind a Tender

    Full notice and submission process on the publisher's site

    Publisher
    UK Cabinet Office
    Licence
    OGL v3.0
    Source
    find-tender.service.gov.uk
    Record ID
    ocds-h6vhtk-07b7b5

    Track

    Know when this goes to tender

    Sonar emails you the day the tender is published, then 7 and 2 days before it closes.

    Track this notice

    Free · No card

    Your fit

    Could you win this?

    A straight answer for your business — bid, partner or pass — based on who wins MOYLE INTERCONNECTOR LIMITED's work like this.

    Check my fit

    Free · No card

    MI
    Buyer
    MOYLE INTERCONNECTOR LIMITED
    Sector
    Engineering