    ContractsLow Carbon Heating System Design and Installation for Council Offices
    Open tender

    Low Carbon Heating System Design and Installation for Council Offices

    Contract value
    £500k
    Published 9 Jun 2026

    Design and deliver a low carbon heating system for a 50,000 sq ft council office building, replacing gas boilers with heat pump technology and renewable energy integration.

    🇬🇧United Kingdom· EnglandPublished 9 Jun 2026· 2 months agoviaFind a Tender
    Contract value
    £500k
    Published 9 Jun 2026

    Decision brief

    4 fields
    • Contract value
      £500,000indicative
      Pounds sterling
    • Closing date
      Rolling
      No closing date published
    • Sector
      Energy & Utilities
      Browse related listings
    • Location
      🇬🇧United Kingdom
      England

    Lifecycle

    Open

    Open tender — no closing date published. Opened 2 months ago.

    9 June 2026
    Open tender · no closing date published

    Brief

    A local authority is seeking design proposals for replacing gas-fired heating with low carbon alternatives at their 50,000 sq ft office building. The building features traditional stone construction with steel frames and glazing, currently heated by gas boilers serving radiators and wet central heating system, with local air conditioning units in meeting rooms and critical areas. The council recently installed 150 kW solar PV with 180 kWh battery storage (generating 145,000 kWh annually) and consumes approximately 425,000 kWh of gas per year for heating with peak demands of 28-34 kW. The council seeks design-led solutions exploring air source heat pumps, ground source heat pumps, hybrid systems with existing boilers, low temperature heating strategies, modest fabric improvements, and integration with existing renewable energy infrastructure. Proposals should include technical approaches, capital costs, operational savings, carbon reduction estimates, payback periods, delivery timelines, and risk assessment. The council prioritizes solutions that minimize disruption, leverage existing infrastructure effectively, and demonstrate both financial and carbon payback metrics.

    More from Cotswold District Council

    4 listingsView all →
    OpenConstruction🇬🇧United Kingdom

    Market Engagement for Recycling Transfer and Food Waste Brokerage Services

    Cotswold District Council invites voluntary market feedback on proposed transfer station and food waste brokerage service approaches to inform future procurement strategy.

    £1,700,000indicativeCotswold District Council
    Published 12 Aug 2026
    AwardedProfessional Services🇬🇧United Kingdom

    Local Plan Masterplanning for Cotswold District

    Prepare masterplanning and site capacity analysis to support Cotswold District Council's emerging Local Plan development.

    £52,540Cotswold District Council
    Published 29 Jun 2026
    AwardedProfessional Services🇬🇧United Kingdom

    External Audit Services 2025/26

    Seeking qualified external auditors to conduct the council's 2025/26 financial accounts audit under PSAA framework regulations.

    £155,563Cotswold District Council
    Published 23 Jun 2026
    AwardedEnvironmental Services🇬🇧United Kingdom

    Habitat Assessment and Accessible Natural Greenspace Study for Cotswold Local Plan

    Commission studies to assess impacts of proposed local plan sites on protected bird habitats and identify accessible greenspace locations to reduce pressure on designated nature conservation areas.

    £35,505Cotswold District Council
    Published 9 Jun 2026

    Open in Energy & Utilities

    4 open listingsView all →
    OpenEnergy & Utilities🇬🇧United Kingdom

    Bulk Fuel Supply Contract for London North Eastern Railway's Aberdeen Depot

    LNER seeks a bulk fuel supplier to deliver approximately 6.2 million litres of BS EN590 diesel annually to its Aberdeen depot under a 12-month contract with extension options through March 2030.

    est.£17,670,000LONDON NORTH EASTERN RAILWAY LIMITED
    Published 11 Aug 2026
    OpenEnergy & Utilities🇬🇧United Kingdom

    Energy Supply and Management Services 2026

    Dynamic Market opportunity to supply electricity and gas services to Odyssey Collaborative Trust sites with ongoing supplier admission and competitive selection.

    Odyssey Collaborative Trust
    Published 11 Aug 2026
    Energy & Utilities🇬🇧United Kingdom

    Natural Gas Supply Contract for Landlord

    Choice is inviting bids from natural gas suppliers for a 24-month landlord contract commencing October 2026.

    Choice Housing Ireland Limited
    Published 11 Aug 2026
    OpenEnergy & Utilities🇬🇧United Kingdom

    Energy Supply Dynamic Market - Electricity and Gas

    Competitive Dynamic Market for electricity and gas supply services to multiple Authority sites, open to new suppliers on a continuous basis.

    YOUR HOUSING GROUP
    Published 10 Aug 2026
    Take action
    View tender on sourceFind a Tender

    Full notice and submission process on the publisher's site

    Publisher
    UK Cabinet Office
    Licence
    OGL v3.0
    Source
    find-tender.service.gov.uk
    Record ID
    ocds-h6vhtk-06b11c
    CD
    Buyer
    Cotswold District Council
    Sector
    Energy & Utilities