Skip to content
BidSonarBidSonar

Market engagement closed

Low Carbon Heating System Design and Installation for Council Offices

Design and deliver a low carbon heating system for a 50,000 sq ft council office building, replacing gas boilers with heat pump technology and renewable energy integration.

Published 9 Jun 2026 · 5 months agoFind a Tender

Market engagement closed on 23 Jun 2026.

View notice on sourceFind a Tender

Original notice on the publisher's site

Engagement closed

23 Jun 2026

5 months ago

Contract value

£500,000indicative

Pounds sterling

Sector

Energy & Utilities

Browse related listings

Location

United Kingdom

England

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-06b11c

Lifecycle

Market engagement closed on 23 Jun 2026. No tender has been published yet.

Closed
  1. Published9 Jun 20265 months ago
  2. Engagement closed23 Jun 202622 weeks ago

Brief

A local authority is seeking design proposals for replacing gas-fired heating with low carbon alternatives at their 50,000 sq ft office building. The building features traditional stone construction with steel frames and glazing, currently heated by gas boilers serving radiators and wet central heating system, with local air conditioning units in meeting rooms and critical areas. The council recently installed 150 kW solar PV with 180 kWh battery storage (generating 145,000 kWh annually) and consumes approximately 425,000 kWh of gas per year for heating with peak demands of 28-34 kW. The council seeks design-led solutions exploring air source heat pumps, ground source heat pumps, hybrid systems with existing boilers, low temperature heating strategies, modest fabric improvements, and integration with existing renewable energy infrastructure. Proposals should include technical approaches, capital costs, operational savings, carbon reduction estimates, payback periods, delivery timelines, and risk assessment. The council prioritizes solutions that minimize disruption, leverage existing infrastructure effectively, and demonstrate both financial and carbon payback metrics.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from Cotswold District Council

4 listingsView all

Open in Energy & Utilities

4 open listingsView all