Awarded contract

London Gateway Port Second Rail Terminal - Phase 2 Construction

DP World is seeking contractors to build a new second rail terminal at London Gateway Port with enhanced rail infrastructure, modern control systems, and increased freight capacity.

Published 23 Nov 2026 · 4 days agoFind a Tender

View on sourceFind a Tender

Award notice and full record on the publisher's site

Closing date

Not published

No closing date published

Contract value

£30,999,487

Pounds sterling

Sector

Construction

Browse related listings

Location

United Kingdom

London

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-066c43

Suppliers

1 supplier

Lifecycle

Contract awarded. Originally published 4 days ago.

Awarded

23 November 2026

Awarded — no open tender advertised

Brief

DP World is expanding its London Gateway Port facility in Stanford le Hope by constructing a new second rail terminal to the west of the existing eastern facility. This project will increase the port's rail freight capacity, improve operational resilience, and support sustainable, low-carbon logistics solutions across the UK. The scope of work includes: (1) Permanent Way Works - construction of new railway infrastructure with five new sidings (7-11) and 21 switches and crossings to connect to the existing network; (2) Civil Engineering Works - installation of an approximately 850-meter reinforced concrete crane rail beam with pile foundations, earthworks, track drainage, utility diversions, and ancillary structures including walkways and cable routes; (3) Telecommunications Works - installation and relocation of operational telecoms, SiSS systems, CCTV cameras, and control panels; (4) Signaling Works - provision of new and relocated signaling assets, a new Shunters Cabin with updated control panel, REB equipment, track circuits, and system integration with existing infrastructure; (5) Electrical and Plant Works - new power supplies and points heating systems; and (6) Interfaces and Integration - coordination with existing operations, utilities, and third-party stakeholders with staged delivery to minimize disruption. Upon completion, the terminal will increase rail-served containerised freight capacity, enhance operational flexibility and resilience, support next-generation robotic RMGC equipment, and reduce the port's carbon footprint through expanded rail freight capability.

Track record

Thin record. Only 1 prior award here — too little to read.

1 award · 1 winner

In construction, LONDON GATEWAY PORT LIMITED has awarded 1 contract to 1 supplier.

Who wins here

  1. Trackwork Ltd1× · 100%

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from LONDON GATEWAY PORT LIMITED

4 listingsView all

Open in Construction

4 open listingsView all