Skip to content
BidSonarBidSonar

Market engagement closed

High Density Sludge (HDS) Pilot Treatment Trials for Mine Water Remediation

Procure specialist supplier to design and operate containerised High Density Sludge pilot treatment trials at three UK mine sites to optimise zinc removal from contaminated mine water.

Published 22 Jul 2026 · 4 months agoFind a Tender

Market engagement closed on 19 Aug 2026.

View notice on sourceFind a Tender

Original notice on the publisher's site

Engagement closed

19 Aug 2026

3 months ago

Contract value

Not disclosed

Source did not declare a figure

Sector

Research & Innovation

Browse related listings

Location

United Kingdom

East Midlands

Publisher
UK Cabinet Office
Licence
OGL v3.0
Record ID
ocds-h6vhtk-06d085

Lifecycle

Market engagement closed on 19 Aug 2026. No tender has been published yet.

Closed
  1. Published22 Jul 20264 months ago
  2. Engagement closed19 Aug 202613 weeks ago

Brief

The Mining Remediation Authority (MRA) is seeking a specialist supplier to design, mobilise, operate and report on containerised pilot-scale High Density Sludge (HDS) treatment trials for metal-contaminated mine water at three UK sites: Threlkeld Lead Mines (Westmorland and Furness), Abbey Consols Mine (Ceredigion, Mid Wales), and Minsterley catchment (Shropshire). The trials will validate HDS treatment performance for zinc-bearing mine waters with varying pH conditions and metal contaminants, establishing optimised operating conditions and generating design, cost and operational data for full-scale treatment schemes. The supplier must provide containerised pilot plant equipment, chemicals, consumables, mobilisation, commissioning, operation, sampling, analysis, monitoring, sludge handling, data management and comprehensive technical reporting. All work must comply with UK health, safety and environmental legislation, the Construction (Design and Management) Regulations 2015, and include full documentation such as method statements, risk assessments, CoSHH assessments and environmental management plans. The supplier must demonstrate proven experience delivering HDS trials for metal-contaminated mine water, technical capability in treating zinc-bearing and net-acidic or circumneutral mine waters, robust field delivery experience and high-quality data production. Key deliverables include trial operation records, testing methodology, performance assessments, optimised operating parameters, sludge characterisation and final reports with conclusions and recommendations for full-scale design. Each trial is estimated at £150,000-£200,000 ex VAT with approximately six weeks duration, expected completion by 31 March 2027. The MRA may procure one or more site-specific trials and may expand to additional sites.

Track record

Open panel. Mostly framework call-offs rather than head-to-head competition.

1 award · 1 winner

In research innovation, MINING REMEDIATION AUTHORITY has awarded 1 contract to 1 supplier.

Who wins here

Across research innovation, the most active winners are WSP UK LIMITED, IPSOS MARKET RESEARCH LIMITED, IFF RESEARCH LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from MINING REMEDIATION AUTHORITY

4 listingsView all

Open in Research & Innovation

4 open listingsView all