The Zeller Land Leisure Pool, originally built as a sports pool about 45 years ago next to an existing outdoor pool, underwent an expansion in 1993, closing the outdoor area except for the children's splash pool. Some parts of the facility are still in their original condition from 1974, while even
Contract awarded. Originally published 9 months ago.
No single supplier dominates the field.
In construction, ZELL MOSEL ASSOCIATION ADMINISTRATION has awarded 6 contracts to 5 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The city of Zell is planning to redesign the Mosel riverbank in several phases. This construction project involves resurfacing the areas, building stairways and seating steps, and establishing new plantings. Suppliers are invited to provide services related to these construction activities, focusing
The Zeller Land Leisure Pool, originally built as a sports pool about 45 years ago, has undergone various changes, including an expansion in 1993. However, many areas of the facility, including parts from 1974, are in poor condition, and even newer components from the 1990s show significant wear and
The city of Zell is planning to renovate the Mosel riverbank in several phases. This construction project involves redesigning the surfaces, building stairways and seating areas, and establishing new landscaping.
This project involves the renovation of the Zeller Land Leisure Pool, which was originally built as a sports pool approximately 45 years ago. In 1993, the indoor pool was expanded, and the outdoor pool area was closed except for the children's splash pool. Some areas of the facility are still in the
Ingoldmells Parish Council invites tenders from experienced contractors to refurbish two children's play areas with new equipment and safety surfacing, with individual budgets of up to £60,000 each.
Council seeks market input on leisure and wellbeing hub improvements for Selby and Skipton as part of a phased investment strategy.
Montrose Port invites experienced contractors to design and construct a new quay with hardstanding, utilities, and dredging at Berths 9-10-11.
The Council invites suppliers to provide market insights on potential solutions for improving two leisure and wellbeing hub facilities as part of a phased investment strategy.