This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Person
Contract awarded. Originally published 10 months ago.
Only 2 prior awards here — too little to read.
In construction, ZURICH AIRPORT LTD has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves construction work for the South Bus Station, including utility line installation and road surface work at the South Junction. Additionally, it includes concrete and specialized deep construction for the establishment of the South Bike Station. Suppliers are invited to submit p
This project involves the construction of a new connecting building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new structure will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Perso
This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to Bus Gate G1 and provide special areas on level G0 for First Class and PRM (Persons with Reduced Mob
This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Person
Tender opportunity for construction contractors to install heat pump systems in 17 Irish schools across eight project Lots, with work commencing in 2025/2026.
Construction contract for a new cross-laminated timber arborist facility with support buildings, climbing wall, and site works at a Galway outdoor education centre.
Heating infrastructure upgrade and site preparation works for biomass heating installation across six schools in Cavan and Monaghan.
Replace and commission an industrial PLC control system for a high-capacity laundry facility processing 35,000 items daily, with delivery required by February 2027.