    ContractsConstruction of New Connection Building at Zurich Airport
    Closed contract

    Construction of New Connection Building at Zurich Airport

    Tender closed
    22 Sept 2025
    12 months ago

    This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Person

    🇨🇭SwitzerlandPublished 19 Aug 2025· 1 years agoviaTED
    Tender closed
    22 Sept 2025
    12 months ago
    Tender deadline passed on 22 Sept 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      22 Sept 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇨🇭Switzerland

    Lifecycle

    Closed

    Tender closed on 22 Sept 2025. Awaiting award.

    19 Aug 2025Today22 Sept 2025

    Brief

    This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Persons with Reduced Mobility) passengers. A turbine bar will be established on the top floor G2 as part of the new Swiss First Class Lounge. The connection building is designed to accommodate various specialized processes to meet the different needs of passenger groups, including optimized control processes and covered parking areas for limousines and special vehicles. The project will prepare the raw construction area for the future Swiss First Class Lounge and the full development of the PRM waiting area on level G1 of Terminal 2. Most technical installations for the lounge will be located on level G3 of Terminal 2. New requirements, such as a smoking lounge, will necessitate additional technical facilities in the southern technical yard. The new building will have its own technical room on G2 with electrical supply and ventilation systems. The structural design of the connection building will align with adjacent buildings, featuring a load-bearing structure made of steel beams and ceilings constructed from hollow core slabs with over-concrete. The design aims for the new building to be perceived as an integrated part of the existing structures, both externally and internally. The facade design will be similar to that of Bus Gate B15, and materials from the surrounding buildings will be used in the interior construction. The work includes static demolitions of existing structures, demolition of interior fittings including building services installations, facade demolition, flat roof, steel construction, foundations, and expansions of the connection corridor, disposal of demolition materials, demolition of coverings, excavation for the construction pit, pile foundations, and open water management.

    Track record

    2 awards · 2 winners
    Thin record

    Only 2 prior awards here — too little to read.

    In construction, ZURICH AIRPORT LTD has awarded 2 contracts to 2 suppliers.

    Who wins here
    1. DESCHNEIDER STEEL CONSTRUCTION INC1× · 50%
    2. DE_Schneider Stahlbau AG1× · 50%

    Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

    More from ZURICH AIRPORT LTD

    4 listingsView all →
    AwardedConstruction🇨🇭Switzerland

    Construction of New Connection Building at Zurich Airport

    This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Person

    CHF 457,501ZURICH AIRPORT LTD
    Published 20 Nov 2025
    Construction🇨🇭Switzerland

    Construction Work for South Bus Station

    This contract involves construction work for the South Bus Station, including utility line installation and road surface work at the South Junction. Additionally, it includes concrete and specialized deep construction for the establishment of the South Bike Station. Suppliers are invited to submit p

    ZURICH AIRPORT LTD
    Published 12 Nov 2025
    Construction🇨🇭Switzerland

    Construction of Airport Buildings – LXS First Lounge & Special Processes

    This project involves the construction of a new connecting building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new structure will enhance access to the bus gate on level G1 and will include special areas on level G0 for First Class and PRM (Perso

    ZURICH AIRPORT LTD
    Published 13 Oct 2025
    Construction🇨🇭Switzerland

    Construction Works for Airport Terminal Connection Building

    This project involves the construction of a new connection building between Terminal 2 and Bus Gate South B15 at Zurich Airport, replacing the existing walkway. The new building will enhance access to Bus Gate G1 and provide special areas on level G0 for First Class and PRM (Persons with Reduced Mob

    ZURICH AIRPORT LTD
    Published 15 Sept 2025

    Open in Construction

    4 open listingsView all →
    Construction🇮🇪Ireland

    Ireland Schools Heat Pump Installation – Works Contractors Needed (2025/2026)

    Tender opportunity for construction contractors to install heat pump systems in 17 Irish schools across eight project Lots, with work commencing in 2025/2026.

    est.€5,450,000DEPARTMENT OF EDUCATION AND YOUTH
    Published 1 Oct 2026
    Construction🇮🇪Ireland

    New Arborist Facility Construction at Petersburg Outdoor Education Centre, Galway

    Construction contract for a new cross-laminated timber arborist facility with support buildings, climbing wall, and site works at a Galway outdoor education centre.

    est.€4,900,000Galway Roscommon Education and Training Board
    Published 30 Sept 2026
    Construction🇮🇪Ireland

    Schools Energy Pathfinder 2025 - Biomass Heating Upgrade Works (Bundle 4, CMETB)

    Heating infrastructure upgrade and site preparation works for biomass heating installation across six schools in Cavan and Monaghan.

    est.€2,500,000CAVAN AND MONAGHAN EDUCATION AND TRAINING BOARD
    Published 30 Sept 2026
    Construction🇬🇧United Kingdom

    Programmable Logic Controller Replacement for Industrial Laundry Washer System

    Replace and commission an industrial PLC control system for a high-capacity laundry facility processing 35,000 items daily, with delivery required by February 2027.

    est.£25,000NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)
    Published 30 Sept 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    542243-2025
    ZA
    Buyer
    ZURICH AIRPORT LTD
    Sector
    Construction