UPPER SILESIAN WATERWORKS JOINT STOCK COMPANY
This contract involves the construction of a renewable energy installation at the GPW S.A. Staszic Pumping Station, which is a registered historical site. The project includes designing, building, and commissioning a photovoltaic installation with a capacity of up to 140 kW, connecting it to the pow
ClosedConstruction🇵🇱PolandPublished 20 Nov 2025
est.PLN 725,912Deadline 5 Dec 2025
UPPER SILESIAN WATERWORKS JOINT STOCK COMPANY
This contract involves the ongoing supply of 77 tons of chlorine, which is used for treating drinking water. The detailed specifications for the goods required can be found in Annex 5 of the Terms of Reference. Additionally, the specific conditions for fulfilling the contract are outlined in Annex 6
AwardedManufacturing🇵🇱PolandPublished 29 May 2025
PLN 847,000
UPPER SILESIAN WATERWORKS JOINT STOCK COMPANY
This contract involves the supply of 60 cubic meters of new granulated activated carbon made from hard coal, intended for water treatment for human consumption. The delivery location is the Water Treatment Station in Kozłowa Góra, Poland. Suppliers must provide evidence that the product meets the sp
ClosedEnergy & Utilities🇵🇱PolandPublished 14 May 2025
est.PLN 300,000Deadline 16 Jun 2025