UPPER SILESIAN WATERWORKS JOINT STOCK COMPANY
This contract involves the construction of a renewable energy installation at the GPW S.A. Staszic Pumping Station, which is a registered historical site. The project includes designing, building, and commissioning a photovoltaic installation with a capacity of up to 140 kW, connecting it to the pow
ClosedConstruction🇵🇱PolandPublished 20 Nov 2025
est.PLN 725,912Deadline 5 Dec 2025
UPPER SILESIAN WATERWORKS JOINT STOCK COMPANY
This contract involves the construction of a connection between DN1600 mm and DN1400 mm pipelines, the reconstruction of a DN1600 mm steel water main to a PE100 RC DN1400 mm pipeline, and local repairs of the DN1600 mm pipeline using cementation. The entire project is located within the city limits
ClosedConstruction🇵🇱PolandPublished 17 Nov 2025
est.PLN 35,726,442Deadline 2 Dec 2025
UPPER SILESIAN WATERWORKS JOINT STOCK COMPANY
This contract involves the ongoing supply of 77 tons of chlorine, which is used for treating drinking water. The detailed specifications for the goods required can be found in Annex 5 of the Terms of Reference. Additionally, the specific conditions for fulfilling the contract are outlined in Annex 6
AwardedManufacturing🇵🇱PolandPublished 29 May 2025
PLN 847,000