This contract involves the planning and design services required for the reconstruction of roads and canals in Sebastianstraße, Bad Neuenahr-Ahrweiler, which were severely damaged during the flood disaster on July 14-15, 2021. The project area is located in the Bad Neuenahr district of the city, whi
Contract awarded. Originally published 10 months ago.
No single supplier dominates the field.
In engineering, CONSTRUCTION AND DEVELOPMENT COMPANY BAD NEUENAHRAHRWEILER LTD has awarded 5 contracts to 5 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
The project involves the construction of a new fire station for the Ahrweiler Volunteer Fire Department, located on Ramersbacher Straße. The existing building was severely damaged by flooding in 2021 and is no longer repairable. A new facility with 12 parking spaces will be built south of the Ahr Ri
This project involves the construction of a new four-group kindergarten (Kita) to replace the St. Pius kindergarten, which was destroyed during the Ahr flood in 2021. The new building will be a two-story structure built with solid materials, covering an area of approximately 3,220 m², with a net usa
This project involves the construction of a new kindergarten to replace the Blandine-Merten-Haus, which was destroyed during the 2021 Ahr flood. The new building will be a two-story structure with solid construction and a partially wooden facade, situated on a plot of approximately 4,465 m². It will
This contract involves the construction of a new four-group kindergarten (Kita) to replace the St. Pius kindergarten, which was destroyed during the Ahr flood in 2021. The project includes a two-story solid construction building with an area of approximately 3,220 m² and a net usable space of around
Derbyshire Dales District Council is seeking a lighting contractor to install, maintain, and dismantle decorative outdoor lighting for the Matlock Bath Illuminations event over three years (2027-2029).
College of Policing invites bids for distribution board replacement, gymnasium lighting, and heating system upgrades at its Ryton facility, with works starting late 2026.
Conduct structural surveys and cost assessments of 1950s/1960s residential complexes to guide future remediation and redevelopment planning.
University of Huddersfield requires inspection, testing, and commissioning services for emergency lighting systems with full documentation and compliance verification.