This contract involves the maintenance of the wastewater network, requiring external support in the form of construction services. The purpose of this tender is to award a contract for cleaning wastewater channels across the entire BLS network. Due to increased requirements for work in the Lötschber
Contract awarded. Originally published 1 year ago.
Only 2 prior awards here — too little to read.
In environmental services, BLS AG FINANCE SCM STRATEGIC PROCUREMENT has awarded 2 contracts to 2 suppliers.
Across environmental services, the most active winners are BIFFA WASTE SERVICES LTD, CHURCHILL CONTRACT SERVICES LTD, SOLO SERVICE GROUP LTD — the field to beat, or your route in as a partner.
BLS AG is seeking a contractor for road renewal projects in Burgistein and Uetendorf scheduled for 2026. This procurement includes two lots and involves various tasks such as: renewing gravel and substructure, constructing or replacing drainage systems, removing existing cable ducts and repositionin
This contract opportunity involves providing services for monitoring measurement and testing equipment, including software and database management, logistics, calibration, repair, and documentation. Initially, these services will be required for the workshops of BBL and BBR after the contract is awa
BLS AG is seeking an Owner's Engineer (OE) for the expansion of the Lötschberg Base Tunnel. The OE will be responsible for several key tasks, including: - **Phase 4**: Developing tender documents for the contractor responsible for the LBT equipment. - Assisting in the evaluation and assessment of
This procurement opportunity involves the rewinding of electric traction motors, specifically the ABB 6 FHA 7067 type, used in BLS Re 465 series locomotives. The stator winding of these motors needs to be replaced. The stator will be provided by the buyer, and the supplier is required to rewind and
Painting services contract available for a property in Penlan, Swansea.
Retrofit of automatic high-pressure water mist fire suppression system for two basement levels of Walter Scott House in Dublin.
Construction of a single storey extension at St. Edwards National School in Sligo to add one classroom and four special education rooms.
DfE and Innovate UK are seeking digital tools to capture and analyze structural condition data from school buildings before demolition to identify defect patterns and inform future maintenance and rebuilding decisions.